Clave | Descripción del Análisis de Precio Unitario | Unidad |
2068-94 | SUMINISTRO E INSTALACION DE LAMINA ANTIDERRAPANTE DE 0.94 M DE ANCHO DE 3/16″ DE ESPESOR INCLUYE HERRAMIENTA, EQUIPO, MATERIAL Y MANO DE OBRA NECESARIA | M2 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
PLACA DE ACERO 1/4″1 | PLACA DE ACERO DE 1/4″ | KG | 15.262000 | $12.50 | $190.78 |
SOLDADURA E-6010 1 | SOLDADURA E-6010 | KG | 1.300000 | $49.88 | $64.84 |
ACETILENO 1 | ACETILENO | KG | 0.480000 | $130.00 | $62.40 |
OXIGENO 1 | OXIGENO | M3 | 0.360000 | $39.00 | $14.04 |
BARRENAN 3/8″X42 1 | BARRENANCLA DE 3/8″ x 4″ | PZA | 4.000000 | $7.00 | $28.00 |
ADITIVO ANTIRUST 1 | ADITIVO PARA FRENAR CORROSION ANTIRUST | LTO | 0.700000 | $80.00 | $56.00 |
PINTURA ANTICORR 1 | PINTURA ANTICORROSIVA | LTO | 0.400000 | $90.00 | $36.00 |
BISAGRA P/REJ 1 | BISAGRA TUBULAR CON PASADOR DE 3/8″ | PZA | 2.000000 | $48.00 | $96.00 |
Suma de Material | $548.06 | ||||
Mano de Obra | |||||
CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.040000 | $307.31 | $12.29 |
OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.400000 | $251.32 | $100.53 |
AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.400000 | $197.97 | $79.19 |
OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 0.400000 | $185.16 | $74.06 |
Suma de Mano de Obra | $266.07 | ||||
Herramienta | |||||
HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $266.07 | $7.98 |
Suma de Herramienta | $7.98 | ||||
Equipo | |||||
PLANTA SOLDAR 1 | PLANTA DE SOLDAR DE GASOLINA | HORA | 0.250000 | $113.61 | $28.40 |
EQUIPO CORTE OX 1 | EQUIPO DE CORTE OXIACETILENO | HORA | 0.250000 | $26.43 | $6.61 |
CAMION WINCHE 1 | CAMION WINCHE FORD DE 5 TON DE CAPACIDAD | HORA | 0.250000 | $285.24 | $71.31 |
EQ SANDBLAST 1 | EQUIPO PARA SANDBAST CON ACCESORIOS | HORA | 0.250000 | $16.28 | $4.07 |
Suma de Equipo | $110.39 | ||||
Costo Directo | $932.50 |