| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2068-70 | SUMINISTRO E INSTALACION DE PLACA ANTIDERRAPANTE DE 0.90 x 0.90 DE 1/4" CON HUECO PARA PASO DE TUBO Y ASEGURADA DEBIDAMENTE INCLUYE HERRAMIENTA, EQUIPO, MATERIAL Y MANO DE OBRA NECESARIA | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| PLACA DE ACERO 1/4"1 | PLACA DE ACERO DE 1/4" | KG | 19.900000 | $12.50 | $248.75 |
| SOLDADURA E-6010 1 | SOLDADURA E-6010 | KG | 0.450000 | $49.88 | $22.45 |
| ACETILENO 1 | ACETILENO | KG | 0.180000 | $130.00 | $23.40 |
| OXIGENO 1 | OXIGENO | M3 | 0.220000 | $39.00 | $8.58 |
| BARRENAN 3/8"X42 1 | BARRENANCLA DE 3/8" x 4" | PZA | 4.000000 | $7.00 | $28.00 |
| ADITIVO ANTIRUST 1 | ADITIVO PARA FRENAR CORROSION ANTIRUST | LTO | 0.300000 | $80.00 | $24.00 |
| PINTURA ANTICORR 1 | PINTURA ANTICORROSIVA | LTO | 0.150000 | $90.00 | $13.50 |
| Suma de Material | $368.68 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.040000 | $307.31 | $12.29 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.400000 | $251.32 | $100.53 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.400000 | $197.97 | $79.19 |
| OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 0.400000 | $185.16 | $74.06 |
| Suma de Mano de Obra | $266.07 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $266.07 | $7.98 |
| Suma de Herramienta | $7.98 | ||||
| Equipo | |||||
| PLANTA SOLDAR 1 | PLANTA DE SOLDAR DE GASOLINA | HORA | 0.250000 | $113.61 | $28.40 |
| EQUIPO CORTE OX 1 | EQUIPO DE CORTE OXIACETILENO | HORA | 0.250000 | $26.43 | $6.61 |
| CAMION WINCHE 1 | CAMION WINCHE FORD DE 5 TON DE CAPACIDAD | HORA | 0.250000 | $285.24 | $71.31 |
| Suma de Equipo | $106.32 | ||||
| Costo Directo | $749.05 |