Bomba Warner motor Briggs-Straton 5M de 30 HP 6″ x 6″ gasto 265 m3/h

Clave Descripción del costo horario Unidad
CHC49 Bomba Warner motor Briggs-Straton 5M de 30 HP 6″ x 6″ gasto 265 m3/h hr
DATOS GENERALES
Vad = VALOR DE ADQUISICIÓN $62,431.93 Pnom = POTENCIA NOMINAL 30.000000 H.P.
Pn = VALOR DE LAS LLANTAS $0.00 Fo = FACTOR DE OPERACION 1.0000
Pa = VALOR DE PIEZAS ESPECIALES $0.00 TIPO DE COMBUSTIBLE Gasolina
Vm = VALOR NETO $62,431.93 Cco = COEFICIENTE DE COMBUSTIBLE 0.1
Vr = VALOR DE RESCATE $15,607.98 Pc = PRECIO DEL COMBUSTIBLE $10.70 /LITRO
i = TASA DE INTERES 16.000000 /AÑO Cc = CAPACIDAD DEL CARTER 0.00 LITROS
s = PRIMA DE SEGUROS 3.000000 /AÑO Tc = TIEMPO ENTRE CAMBIO DE ACEITE 0 HORAS
Ko = FACTOR DE MANTENIMIENTO 0.410000 HORAS Fl = FACTOR DE LUBRICANTE 0.0015
Ve = VIDA ECONÓMICA 2,250.00 HORAS Pac = PRECIO DEL ACEITE $48.28 /LITRO
Vn = VIDA ECONÓM. DE LAS LLANTAS 0.00 HORAS Gh=CANTIDAD DE COMBUSTIBLE = Cco*Fo*Pnom 3.000000 LITROS/HORA
Va = VIDA ECONOM. PIEZAS ESPECIALES 0.00 HORAS Ah=CANTIDAD DE LUBRICANTE = Fl*Fo*Pnom 0.045000 LITROS/HORA
Hea = HORAS TRABAJADAS POR AÑO 750.00 HORAS Ga=CONSUMO ENTRE CAMBIOS DE LUBRICANTE = Cc/Tc 0.000000 LITROS/HORA
Ht = Horas por turno 6.400000 Ht = HORAS
CONCEPTO OPERACIONES ACTIVO EN ESPERA EN RESERVA
COSTOS FIJOS
DEPRECIACIÓN (D) = (Vm-Vr)/Ve (62431.93-15607.98)/2250.00 $20.81 $16.65 $16.65
INVERSIÓN (Im) = [(Vm+Vr)/2Hea]i [(62431.93+15607.98)/(2*750.00)]0.160000 $8.32 $8.32 $8.32
SEGURO (Sm) = [(Vm+Vr)/2Hea]s [(62431.93+15607.98)/(2*750.00)]0.030000 $1.56 $1.56 $1.56
MANTENIMIENTO (Mn) = Ko * D 0.410000*20.81 $8.53 $8.53 $6.82
Costos fijos $39.22 $35.06 $33.35
CARGOS POR CONSUMO
COMBUSTIBLE Co = GhxPc 3.000000*10.70 $32.10 $9.63 $0.00
OTRAS FUENTES DE ENERGÍA 0*0 $0.00 $0.00 $0.00
LUBRICANTES Lb = (Ah+Ga)Pac (0.045000+0)48.28 $2.17 $0.65 $0
LLANTAS = Pn/Vn 0/0 $0.00 $0.00 $0.00
PIEZAS ESPECIALES = Pa/Va 0/0 $0.00 $0.00 $0.00
Cargos por consumo $34.27 $10.28 $0.00
CARGOS POR OPERACIÓN
CATEGORÍA CANTIDAD SALARIO REAL Ht ACTIVO EN ESPERA EN RESERVA
Operador de equipo menor 1 $471.88 6.400000 $73.73 $0.00 $0.00
SUMA (Sr) $471.88 6.400000 $73.73 $0.00 $0.00
Cargos por operación (Sr/Ht) $73.73 $0 $0
Costo Directo por Hora $147.22 $45.34 $33.35

Página  [tcb_pagination_current_page]  de  [tcb_pagination_total_pages]


×
Usuarios Free solo pueden consultar un número limitado de páginas (). Haz clic aquí para suscribirte y obtener acceso a los análisis.