Clave | Descripción del Análisis de Precio Unitario | Unidad |
2068-19 | SUMINISTRO E INSTALACION DE REJILLA DE ACERO TIPO IRVING PLASTIFICADA EN PERALTE DE 1″ x 3/16″ CON CORTE Y FIJACION INCLUYE HERRAMIENTA, EQUIPO, MATERIAL Y MANO DE OBRA NECESARIA | M2 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
REJILLA IRVING 2 | REJILLA IRVING PULTRUIDA | M2 | 1.150000 | $2,440.00 | $2,806.00 |
SOLERA 1″*3/16″ 1 | SOLERA 1″ x 3/16″ | KG | 0.200000 | $16.00 | $3.20 |
BISAGRA P/REJ 1 | BISAGRA TUBULAR CON PASADOR DE 3/8″ | PZA | 0.500000 | $48.00 | $24.00 |
SOLDADURA E-6010 1 | SOLDADURA E-6010 | KG | 0.400000 | $49.88 | $19.95 |
OXIGENO 1 | OXIGENO | M3 | 0.250000 | $39.00 | $9.75 |
ACETILENO 1 | ACETILENO | KG | 0.150000 | $130.00 | $19.50 |
PINTURA ROJO OXIDO 1 | PINTURA ROJO OXIDO | LTO | 1.000000 | $71.50 | $71.50 |
Suma de Material | $2,953.90 | ||||
Mano de Obra | |||||
CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.008000 | $307.31 | $2.46 |
OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.080000 | $251.32 | $20.11 |
AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.080000 | $197.97 | $15.84 |
OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 0.800000 | $185.16 | $148.13 |
Suma de Mano de Obra | $186.54 | ||||
Herramienta | |||||
HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $186.54 | $5.60 |
Suma de Herramienta | $5.60 | ||||
Equipo | |||||
SOLDADORA 300 AMP 1 | SOLDADORA LINCOLN 300 AMP MOTOR DIESEL DE 60 HP | HORA | 0.800000 | $113.61 | $90.89 |
EQUIPO CORTE OX 1 | EQUIPO DE CORTE OXIACETILENO | HORA | 0.800000 | $26.43 | $21.14 |
CAMION PLATAF 3 T 1 | CAMION PLATAFORMA FORD DE 3 TON DE CAPACIDAD | HORA | 0.100000 | $202.91 | $20.29 |
Suma de Equipo | $132.32 | ||||
Costo Directo | $3,278.36 |