Clave | Descripción del Análisis de Precio Unitario | Unidad |
PB-ANZ-06 | SUMINISTRO E INSTALACION DE INTERRUPTORES TERMOMAGNETICOS DE LA SERIE I LINE EN TABLERO DE CONTROL DE CORRIENTE DIRECTA C.D. (PCD) Y EN TABLERO PP-1, PARA EL BANCO DE BATERIAS INCLUYE SUMINISTRO HASTA 08 PIEZAS INCLUYE ALIMENTACION ELECTRICA DESDE EL BANCO DE BATERIAS Y TODO LO NECESARIO PARA SU CORRECTO FUNCIONAMIENTO. VER PLANO EL-10 EL-11 (CLAVE 11) | PZA |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
INT TER I LINE | INTERRUPTOR TERMOMAGNETICO DE LA SERIE I LINE | PZA | 1.000000 | $2,061.90 | $2,061.90 |
INT TER 2 X 30 A | INTERRUPTOR TERMOMAGNETICO DE 2 x 30 AMP | PZA | 1.000000 | $415.00 | $415.00 |
CENTRO CAR 220 VAC | CENTRO DE CARGA DE 220 VAC | PZA | 0.125000 | $1,140.00 | $142.50 |
CABLE MULT CAL 2*10 | CABLE MULTICONDUCTOR FLEXIBLE CAL # 2×10 AWG | M | 50.000000 | $50.00 | $2,500.00 |
CABLE MULT CAL 3*10 | CABLE MULTICONDUCTOR FLEXIBLE CAL # 3×10 AWG | M | 15.000000 | $34.54 | $518.10 |
TUBO COND PVC 3″ 1 | TUBO CONDUIT PVC DE 3″ P/PESADO | M | 12.500000 | $51.40 | $642.50 |
Suma de Material | $6,280.00 | ||||
Mano de Obra | |||||
CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.100000 | $307.31 | $30.73 |
OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 1.000000 | $251.32 | $251.32 |
AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 1.000000 | $197.97 | $197.97 |
OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 1.000000 | $185.16 | $185.16 |
Suma de Mano de Obra | $665.18 | ||||
Herramienta | |||||
HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $665.18 | $19.96 |
Suma de Herramienta | $19.96 | ||||
Equipo | |||||
CAMIONETA PICK-UP 1 | CAMIONETA PICK-UP FORD DE 3/4 TON DE CAPACIDAD | HORA | 0.250000 | $221.67 | $55.42 |
TALADRO ELECTRICO 1 | TALADRO ELECTRICO BLACK AND DECKER DE PESADO 1/4″ | HORA | 2.000000 | $4.10 | $8.20 |
EQ MULTIMETRO 1 | EQUIPO PARA MULTIMETRO DIGITAL PROFESIONAL CON AUTORANGO STEREN MUL-285 AMARILLO | HORA | 2.000000 | $11.28 | $22.56 |
Suma de Equipo | $86.18 | ||||
Costo Directo | $7,051.32 |