Clave | Descripción del Análisis de Precio Unitario | Unidad |
5082-01 | DISEÑO Y FABRICACION Y ACOPLAMIENTO DE DESCARGAS DE ACERO DE 12″ INCLUYE EQUIPOS Y ACCESORIOS PARA SU INSTALACION | PZA |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
TUBO ACERO 12″ 1 | TUBO DE ACERO CED-80 DE 12″ DE DIAMETRO | M | 24.000000 | $3,476.63 | $83,439.12 |
SOLDADURA E-6010 1 | SOLDADURA E-6010 | KG | 25.000000 | $49.88 | $1,247.00 |
ACETILENO 1 | ACETILENO | KG | 2.500000 | $130.00 | $325.00 |
OXIGENO 1 | OXIGENO | M3 | 2.500000 | $39.00 | $97.50 |
PINTURA ANTICORR 1 | PINTURA ANTICORROSIVA | LTO | 12.000000 | $90.00 | $1,080.00 |
PINT ESMALTE 1 | PINTURA ESMALTE | LTO | 20.000000 | $90.00 | $1,800.00 |
THINER 1 | THINER PARA PINTURA EPOXIMASTIC | LTO | 4.000000 | $40.00 | $160.00 |
Suma de Material | $88,148.62 | ||||
Mano de Obra | |||||
CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.800000 | $307.31 | $245.85 |
OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 8.000000 | $251.32 | $2,010.56 |
AYUDANTE OP ESP 1 | AYUDANTE OPERARIO ESPECIALISTA | JOR | 8.000000 | $195.39 | $1,563.12 |
AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 8.000000 | $197.97 | $1,583.76 |
OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 12.000000 | $185.16 | $2,221.92 |
Suma de Mano de Obra | $7,625.21 | ||||
Herramienta | |||||
HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $7,625.21 | $228.76 |
Suma de Herramienta | $228.76 | ||||
Equipo | |||||
SOLDADORA 300 AMP 1 | SOLDADORA LINCOLN 300 AMP MOTOR DIESEL DE 60 HP | HORA | 16.000000 | $113.61 | $1,817.76 |
COMPRESOR AIRE 250 2 | COMPRESOR DE AIRE INGERSOLL RAND DE 250 PCM MOTOR DIESEL 105 HP | HORA | 12.000000 | $163.21 | $1,958.52 |
EQ SANDBLAST 1 | EQUIPO PARA SANDBAST CON ACCESORIOS | HORA | 12.000000 | $16.28 | $195.36 |
CAMION WINCHE 1 | CAMION WINCHE FORD DE 5 TON DE CAPACIDAD | HORA | 8.000000 | $285.24 | $2,281.92 |
Suma de Equipo | $6,253.56 | ||||
Costo Directo | $102,256.15 |