| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 7108-02 | SUMINISTRO E INSTALACION DE CIELO FALSO DE 2' x 4' EN ALUMINIO INCLUYE COLGANTES, ALUMINIO, RETENIDAS DE ALAMBRE GALVANIZADO Y TODO LO NECESARIO PARA SU INSTALACION | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| ALAMBRE REC #18 1 | ALAMBRE RECOCIDO # 18 | KG | 0.154000 | $19.00 | $2.93 |
| CEMENTO GRIS 1 | CEMENTO GRIS NORMAL | TON | 0.000400 | $2,378.40 | $0.95 |
| ALAMBRON DE 1/4" 1 | ALAMBRON DE 1/4" | KG | 1.000000 | $16.22 | $16.22 |
| CANALETA C#22 38 MM | CANALETA CAL # 22 DE 38 MM | ML | 1.500000 | $7.00 | $10.50 |
| CANALETA C#22 19 MM | CANALETA CAL # 22 DE 19 MM | ML | 4.000000 | $6.00 | $24.00 |
| METAL DESPLEGADO 1 | METAL DESPLEGADO CAL # 6 PR SECC 1.0 | M2 | 1.100000 | $45.00 | $49.50 |
| TAQUETE DE PLASTICO | TAQUETE DE PLASTICO DE 1" No 8 | PZA | 5.000000 | $1.10 | $5.50 |
| TORNILLO P/YESO 1 | TORNILLO PARA YESO # 8-18 x 26.5 (100 PZAS) | PZA | 1.000000 | $0.70 | $0.70 |
| Suma de Material | $110.30 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.015000 | $307.31 | $4.61 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.150000 | $251.32 | $37.70 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.150000 | $197.97 | $29.70 |
| Suma de Mano de Obra | $72.01 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $72.01 | $2.16 |
| Suma de Herramienta | $2.16 | ||||
| Auxiliar | |||||
| MOR YESO CEM AGUA 1 | MORTERO-YESO-CEMENTO GRIS-AGUA | M3 | 0.030000 | $606.43 | $18.19 |
| ANDAMIO TUBULAR 1 | ANDAMIO DE ACERO TUBULAR DE 4.00 M DE ALTURA | R/D | 0.200000 | $85.00 | $17.00 |
| Suma de Auxiliar | $35.19 | ||||
| Costo Directo | $219.66 |