Clave | Descripción del Análisis de Precio Unitario | Unidad |
09-2230 | PISO DE CONCRETO ARMADO DE 8 CM DE ESPESOR CONCRETO PREMEZCLADO F’C=150 KG/CM2, AGREGADO MAXIMO 3/4″ REFUERZO = MALLA 66-1010 SIN ACABADO | M2 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
0900-04 | CONCRETO PREMEZC.RN F’C=150 KG/CM2 AGREGADO MAXIMO 3/4″ (A) | M3 | 0.083200 | $1,544.91 | $128.54 |
0107-00 | MALLA ELECTROSOLDADA TECNOMALLA 6 X 6-10/10 | M2 | 1.020000 | $14.39 | $14.68 |
0300-03 | CEMENTO NORMAL GRIS TIPO I EN SACO | TON | 0.001000 | $1,694.85 | $1.69 |
Suma de Material | $144.91 | ||||
Mano de Obra | |||||
02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | JOR | 0.100000 | $756.84 | $75.68 |
Suma de Mano de Obra | $75.68 | ||||
Costo Directo | $220.59 |