Clave | Descripción del costo horario | Unidad |
EQABM002 | Bomba Reinert para concreto p-6 capacidad 73 m3/hr motor cat 3208 de 125 hp tubo 7″ | hr |
DATOS GENERALES | ||||||
Vad = VALOR DE ADQUISICIÓN | $1,364,440.13 | Pnom = POTENCIA NOMINAL | 0 | H.P. | ||
Pn = VALOR DE LAS LLANTAS | $0.00 | Fo = FACTOR DE OPERACION | 0 | |||
Pa = VALOR DE PIEZAS ESPECIALES | $0.00 | TIPO DE COMBUSTIBLE | NoUtiliza | |||
Vm = VALOR NETO | $1,364,440.13 | Cco = COEFICIENTE DE COMBUSTIBLE | 0 | |||
Vr = VALOR DE RESCATE | $272,888.03 | Pc = PRECIO DEL COMBUSTIBLE | $5.54 | /LITRO | ||
i = TASA DE INTERES | 8.700000 | /AÑO | ||||
s = PRIMA DE SEGUROS | 2.000000 | /AÑO | ||||
Ko = FACTOR DE MANTENIMIENTO | 1.000000 | HORAS | ||||
Ve = VIDA ECONÓMICA | 8,000.00 | HORAS | ||||
Vn = VIDA ECONÓM. DE LAS LLANTAS | 0.00 | HORAS | Gh=CANTIDAD DE COMBUSTIBLE = Cco*Fo*Pnom | 12.500000 | LITROS/HORA | |
Va = VIDA ECONOM. PIEZAS ESPECIALES | 0.00 | HORAS | ||||
Hea = HORAS TRABAJADAS POR AÑO | 1,000.00 | HORAS | ||||
CONCEPTO | OPERACIONES | ACTIVO | EN ESPERA | EN RESERVA | ||
COSTOS FIJOS | ||||||
DEPRECIACIÓN (D) = (Vm-Vr)/Ve | (1364440.13-272888.03)/8000.00 | $136.44 | $20.47 | $20.47 | ||
INVERSIÓN (Im) = [(Vm+Vr)/2Hea]i | [(1364440.13+272888.03)/(2*1000.00)]0.087000 | $71.22 | $71.22 | $71.22 | ||
SEGURO (Sm) = [(Vm+Vr)/2Hea]s | [(1364440.13+272888.03)/(2*1000.00)]0.020000 | $16.37 | $16.37 | $16.37 | ||
MANTENIMIENTO (Mn) = Ko * D | 1.000000*136.44 | $136.44 | $20.47 | $0.00 | ||
Costos fijos | $360.47 | $128.53 | $108.06 | |||
CARGOS POR CONSUMO | ||||||
12.500000*5.54 | $69.25 | $0.00 | $3.46 | |||
OTRAS FUENTES DE ENERGÍA | 0*0 | $0.00 | $0.00 | $0.00 | ||
CAPACIDAD INSTALADA Cpi = Gh/(Hea/Ma)xPc | 12.500000/(1000.000000/0)*5.54 | $0 | $0 | $0 | ||
LLANTAS = Pn/Vn | 0/0 | $0.00 | $0.00 | $0.00 | ||
PIEZAS ESPECIALES = Pa/Va | 0/0 | $0.00 | $0.00 | $0.00 | ||
Cargos por consumo | $76.26 | $0.00 | $3.81 | |||
CARGOS POR OPERACIÓN | ||||||
CATEGORÍA | CANTIDAD | SALARIO REAL | Ht | ACTIVO | EN ESPERA | EN RESERVA |
Operador bomba de concreto | 0.125 | $437.20 | 1.000000 | $437.20 | $0.00 | $0.00 |
Cargos por operación | ||||||
Costo Directo por Hora | $491.38 | $128.53 | $111.87 |