Petrolizadora Seaman Gunnison de 4300 It. 1140 de 155 hp, motor Vam mod. 6558 bomba 756 Ipm barra 3.66 m sin/camión

Clave Descripción del costo horario Unidad
1929-04-29 Petrolizadora Seaman Gunnison de 4300 It. 1140 de 155 hp, motor Vam mod. 6558 bomba 756 Ipm barra 3.66 m sin/camión hr
DATOS GENERALES
Vad = VALOR DE ADQUISICIÓN $432,198.57 Pnom = POTENCIA NOMINAL 155.000000 H.P.
Pn = VALOR DE LAS LLANTAS $0.00 Fo = FACTOR DE OPERACION 1.0000
Pa = VALOR DE PIEZAS ESPECIALES $0.00 TIPO DE COMBUSTIBLE Gasolina
Vm = VALOR NETO $432,198.57 Cco = COEFICIENTE DE COMBUSTIBLE 0.1
Vr = VALOR DE RESCATE $86,439.71 Pc = PRECIO DEL COMBUSTIBLE $10.70 /LITRO
i = TASA DE INTERES 16.000000 /AÑO Cc = CAPACIDAD DEL CARTER 0.00 LITROS
s = PRIMA DE SEGUROS 2.000000 /AÑO Tc = TIEMPO ENTRE CAMBIO DE ACEITE 0 HORAS
Ko = FACTOR DE MANTENIMIENTO 0.700000 HORAS Fl = FACTOR DE LUBRICANTE 0.0015
Ve = VIDA ECONÓMICA 8,000.00 HORAS Pac = PRECIO DEL ACEITE $48.28 /LITRO
Vn = VIDA ECONÓM. DE LAS LLANTAS 0.00 HORAS Gh=CANTIDAD DE COMBUSTIBLE = Cco*Fo*Pnom 15.500000 LITROS/HORA
Va = VIDA ECONOM. PIEZAS ESPECIALES 0.00 HORAS Ah=CANTIDAD DE LUBRICANTE = Fl*Fo*Pnom 0.232500 LITROS/HORA
Hea = HORAS TRABAJADAS POR AÑO 2,000.00 HORAS Ga=CONSUMO ENTRE CAMBIOS DE LUBRICANTE = Cc/Tc 0.000000 LITROS/HORA
Ht = Horas por turno 6.400000 Ht = HORAS
CONCEPTO OPERACIONES ACTIVO EN ESPERA EN RESERVA
COSTOS FIJOS
DEPRECIACIÓN (D) = (Vm-Vr)/Ve (432198.57-86439.71)/8000.00 $43.22 $34.58 $34.58
INVERSIÓN (Im) = [(Vm+Vr)/2Hea]i [(432198.57+86439.71)/(2*2000.00)]0.160000 $20.75 $20.75 $20.75
SEGURO (Sm) = [(Vm+Vr)/2Hea]s [(432198.57+86439.71)/(2*2000.00)]0.020000 $2.59 $2.59 $2.59
MANTENIMIENTO (Mn) = Ko * D 0.700000*43.22 $30.25 $30.25 $24.20
Costos fijos $96.81 $88.17 $82.12
CARGOS POR CONSUMO
COMBUSTIBLE Co = GhxPc 15.500000*10.70 $165.85 $49.76 $0.00
OTRAS FUENTES DE ENERGÍA 0*0 $0.00 $0.00 $0.00
LUBRICANTES Lb = (Ah+Ga)Pac (0.232500+0)48.28 $11.23 $3.37 $0
LLANTAS = Pn/Vn 0/0 $0.00 $0.00 $0.00
PIEZAS ESPECIALES = Pa/Va 0/0 $0.00 $0.00 $0.00
Cargos por consumo $177.08 $53.13 $0.00
CARGOS POR OPERACIÓN
CATEGORÍA CANTIDAD SALARIO REAL Ht ACTIVO EN ESPERA EN RESERVA
Operador de 1a. p/equipos menores 1 $471.88 6.400000 $73.73 $0.00 $0.00
SUMA (Sr) $471.88 6.400000 $73.73 $0 $0
Cargos por operación (Sr/Ht) $73.73 $0 $0
Costo Directo por Hora $347.62 $141.30 $82.12

Página  [tcb_pagination_current_page]  de  [tcb_pagination_total_pages]


×
Usuarios Free solo pueden consultar un número limitado de páginas (). Haz clic aquí para suscribirte y obtener acceso a los análisis.