Clave | Descripción del Análisis de Precio Unitario | Unidad |
REPIS001 | Repison decorativo de concreto f’c=150 kg/cm2, armado con malla-lac, acabado pulido, cimbrado con molde de fibra de vidrio. | ML |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
01MAL010 | MALLALAC 6×6/10-10 | M2 | 0.263000 | $15.00 | $3.95 |
06CIM005 | CIMBRAPLAY DE 5/8″ | M2 | 0.060000 | $110.00 | $6.60 |
06MAD001 | MADERA DE PINO | PT | 0.900000 | $10.00 | $9.00 |
13DIE000 | DIESEL | LT | 0.144000 | $7.00 | $1.01 |
06CLA001 | CLAVOS | KG | 0.096000 | $18.00 | $1.73 |
06TUI000 | TUINO DE MADERA | ML | 1.030000 | $4.00 | $4.12 |
Suma de Material | $26.41 | ||||
Mano de Obra | |||||
MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.166700 | $401.97 | $67.01 |
MOA05004 | P E O N | JOR | 0.166700 | $210.17 | $35.04 |
MI000001 | MANDO INTERMEDIO | (%)MO | 0.050000 | $102.05 | $5.10 |
Suma de Mano de Obra | $107.15 | ||||
Herramienta | |||||
HE000001 | HERRAMIENTA MENOR | (%)MO | 0.020000 | $102.05 | $2.04 |
Suma de Herramienta | $2.04 | ||||
Auxiliar | |||||
BASIC005 | CONCRETO F’C=150 KG/CM2, T.M.A. 3/4″ | M3 | 0.027190 | $1,185.15 | $32.22 |
Suma de Auxiliar | $32.22 | ||||
Costo Directo | $167.82 |