| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| CAJVAL05 | Caja de operaci贸n de v谩lvulas tipo 5, con medidas interiores de 1.30 x 0.90 mts, con muros de tabique de 14 cms de espesor, aplanado y pulido interior con mortero cemento-arena 1:3, plantilla de concreto f'c=150 kg/cm2 de 10 cms de espesor y losa de concreto f'c=250 kg/cm2 t.m.a 3/4", armada con varilla de 3/8" a cada 20 cms en ambos sentidos; se incluye: materiales, mano de obra y herramienta. | PZA |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 28AGUA00 | AGUA CON PIPA | M3 | 0.100000 | $80.00 | $8.00 |
| 01VAR004 | VARILLA CORRUGADA DE 1/2" | KG | 25.833600 | $8.60 | $222.17 |
| 01VAR003 | VARILLA CORRUGADA DE 3/8" | KG | 32.292000 | $8.60 | $277.71 |
| 01ALA005 | ALAMBRON DE 1/4" | KG | 8.381100 | $19.00 | $159.24 |
| 01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 24.980600 | $18.00 | $449.65 |
| 06CLA001 | CLAVOS | KG | 0.675000 | $18.00 | $12.15 |
| 02CEM000 | CEMENTO GRIS | KG | 2.400000 | $2.40 | $5.76 |
| 19TAB005 | TABIQUE ROJO RECOCIDO | PZA | 400.000000 | $2.10 | $840.00 |
| 03ARE000 | ARENA | M3 | 1.345500 | $130.01 | $174.93 |
| 06MAD001 | MADERA DE PINO | PT | 5.900000 | $10.00 | $59.00 |
| Suma de Material | $2,208.61 | ||||
| Mano de Obra | |||||
| MOA05004 | P E O N | JOR | 2.325580 | $210.17 | $488.77 |
| MOA05001 | OFICIAL ALBA脩IL 1RA. | JOR | 2.325580 | $401.97 | $934.81 |
| MI000001 | MANDO INTERMEDIO | (%)MO | 0.050000 | $1,423.58 | $71.18 |
| Suma de Mano de Obra | $1,494.76 | ||||
| Herramienta | |||||
| HE000001 | HERRAMIENTA MENOR | (%)MO | 0.020000 | $1,423.58 | $28.47 |
| Suma de Herramienta | $28.47 | ||||
| Equipo | |||||
| 90CHRE01 | RETROEXCAVADORA | HR | 0.200000 | $382.95 | $76.59 |
| Suma de Equipo | $76.59 | ||||
| Auxiliar | |||||
| BASIC005 | CONCRETO F'C=150 KG/CM2, T.M.A. 3/4" | M3 | 0.397300 | $1,185.15 | $470.86 |
| BASIC009 | CONCRETO F'C=250 KG/CM2, T.M.A. 3/4" | M3 | 0.319400 | $1,461.63 | $466.84 |
| BASIM003 | MEZCLA CEMENTO-ARENA 1:3 | M3 | 0.330900 | $1,510.95 | $499.97 |
| BASIC000 | CURADO CON CURACRETO | M2 | 1.920000 | $4.01 | $7.70 |
| Suma de Auxiliar | $1,445.37 | ||||
| Costo Directo | $5,253.80 |