Materiales |
|
|
|
|
CCPIIIMA26 |
2) en matl b |
m3 |
1 |
197.56 |
197.56 |
CCPIIIMA265 |
Tapa pvc ced 40 cementar 50 mm |
m |
4 |
901.32 |
3605.28 |
CCPIIIMA266 |
Codo galv 90° x 10 mm |
pz |
4 |
15.41 |
61.64 |
CCPIIIMA267 |
Relleno compactado con matl producto de banco |
m3 |
1.5 |
125.71 |
188.57 |
|
Suma de Materiales |
|
|
|
4053.05 |
|
Mano de Obra |
|
|
|
|
CCPIIIMO26 |
Cuadrilla tuberos: 0.7 de cabo + 1 tubero 1 a + 2 tuberos 2 a + 4 peones |
jor |
0.0357 |
5570.7 |
198.87 |
|
Suma de Mano de Obra |
|
|
|
198.87 |
|
Herramienta |
|
|
|
|
CCPIIIHE01 |
Herramienta menor |
% |
3 |
6242.12 |
18726.36 |
|
Suma de Herramienta |
|
|
|
18726.36 |
|
Costo Directo |
|
|
|
22978.28 |