| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 100501 | Limpieza y trazo en el area de trabajo | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| MADERA-02 | MADERA DE PINO DE TERCERA | PT | 0.030000 | $8.08 | $0.24 |
| HILO-01 | HILO P/TRAZO | ml | 2.000000 | $0.05 | $0.10 |
| ACBXX007 | CAL HIDRATADA CALHIDRA | TON | 0.000300 | $1,000.40 | $0.30 |
| Suma de Material | $0.64 | ||||
| Auxiliar | |||||
| CUAD-001 | CUADRILLA No. 1 1 PEON. | jor | 0.003500 | $238.39 | $0.83 |
| CUAD-016 | CUADRILLA No. 16 1 OF. TOPOGRAFO + 1 AYTE. | jor | 0.003500 | $599.14 | $2.10 |
| Suma de Auxiliar | $2.93 | ||||
| Costo Directo | $3.57 |