Clave | Descripción del auxiliar o básico | Unidad |
BASIP091 | CALZA DE CONCRETO (POLLO) PARA ACERO INFERIOR | PZA |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 0.03 | 18 | 0.54 |
06MAD001 | MADERA DE PINO | PT | 0.004 | 10 | 0.04 |
06CLA001 | CLAVOS | KG | 0.01 | 18 | 0.18 |
13DIE000 | DIESEL | LT | 0.01 | 7 | 0.07 |
Suma de Material | 0.83 | ||||
Mano de Obra | |||||
MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.004 | 401.97 | 1.61 |
MI000001 | MANDO INTERMEDIO | (%)MO | 0.05 | 1.61 | 0.08 |
Suma de Mano de Obra | 1.69 | ||||
Herramienta | |||||
HE000001 | HERRAMIENTA MENOR | (%)MO | 0.02 | 1.61 | 0.03 |
Suma de Herramienta | 0.03 | ||||
Auxiliar | |||||
BASIC007 | CONCRETO F’C=200 KG/CM2, T.M.A. 3/4″ | M3 | 0.00013 | 1272.72 | 0.17 |
Suma de Auxiliar | 0.17 | ||||
Costo Directo | 2.72 |