| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ALBIM-007/4.5MM/MO | IMPERMEABILIZACIÓN EN LOSA DE AZOTEA INCLINADA, INCLUYE PREPARACIÓN DE LA SUPERFICIE (LIMPIEZA), APLICACIÓN DE HIDROPRIMER (IMPERPRIMER), CALAFATEO DE GRIETAS Y FISURAS CON PLASTIC-CEMENT, REFUERZO DE PUNTOS CRÍTICOS CON FESTERMIP SBS 4.00 mm., APLICACIÓN DE MEMBRANA FESTERMIP DE 4.5 mm. SBS CALENTADA Y COLOCADA POR MEDIO DE SOPLETE ACABADO GRANULAR BLANCO, HASTA UNA ALTURA MÁXIMA DE 10.00 mts., INCLUYE: MATERIALES, HERRAMIENTA, MANO DE OBRA, ACARREOS, DESPERDICIOS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| IMP1 | HIDROPRIMER | LT | 0.104167 | $26.00 | $2.71 |
| IMP1 | HIDROPRIMER | LT | 0.104167 | $26.00 | $2.71 |
| IMP1 | HIDROPRIMER | LT | 0.104167 | $26.00 | $2.71 |
| IMP2 | CEMENTO PLASTICO PLASTICEMENT | LT | 0.038462 | $102.65 | $3.95 |
| IMP2 | CEMENTO PLASTICO PLASTICEMENT | LT | 0.038462 | $102.65 | $3.95 |
| IMP2 | CEMENTO PLASTICO PLASTICEMENT | LT | 0.038462 | $102.65 | $3.95 |
| IMP021 | MEMBRANA FESTERMIP 4.0 MM SBS, ACABADO GRANULAR BLANCO. | M2 | 1.100000 | $210.54 | $231.59 |
| IMP021 | MEMBRANA FESTERMIP 4.0 MM SBS, ACABADO GRANULAR BLANCO. | M2 | 1.100000 | $210.54 | $231.59 |
| IMP021 | MEMBRANA FESTERMIP 4.0 MM SBS, ACABADO GRANULAR BLANCO. | M2 | 1.100000 | $210.54 | $231.59 |
| Suma de Material | $714.75 | ||||
| Mano de Obra | |||||
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.078740 | $843.43 | $66.41 |
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.078740 | $843.43 | $66.41 |
| CUAD-0530-01 | CUADRILLA No. 0530 ( 1 OF. PINTOR + 1 AYUDANTE ) | JOR | 0.078740 | $843.43 | $66.41 |
| Suma de Mano de Obra | $199.24 | ||||
| Equipo | |||||
| MAQ-ZG | SOPLETE DE GAS | HOR | 0.420000 | $3.17 | $1.33 |
| MAQ-ZG | SOPLETE DE GAS | HOR | 0.420000 | $3.17 | $1.33 |
| MAQ-ZG | SOPLETE DE GAS | HOR | 0.420000 | $3.17 | $1.33 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H | % HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| H2 | % EQUIPO DE SEGURIDAD | (%)mo | 0.020000 | $0.00 | $0.00 |
| Suma de Equipo | $3.99 | ||||
| Costo Directo | $917.98 |