| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 1410 | Señales informativas de destino c) SID-10 | pza |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 02-0093-00 | Soldadura E-7018 | kg | 2.000000 | $46.33 | $92.66 |
| 02-0817-00 | Primario Anticorrosivo | lt | 0.600000 | $67.00 | $40.20 |
| 02-0815-00 | Estopa | kg | 0.350000 | $28.97 | $10.14 |
| 02-0820-00 | Papel Kraft | kg | 0.080000 | $9.00 | $0.72 |
| 02-0821-00 | Bajo alfombra poli-pad | m2 | 0.100000 | $6.50 | $0.65 |
| 02-0823-01 | Monten en canal 6" x 6" cal. 6 >>4.2m*25.5 kg/m*1.03 desp=110.3130 kg | kg | 110.313000 | $10.53 | $1,161.60 |
| 02-0810-00 | Scotch lite grado ingenieria blanco | m2 | 0.960000 | $207.45 | $199.15 |
| 02-0816-00 | Adelgazador thinner | lt | 2.500000 | $16.00 | $40.00 |
| 02-0085-01 | Pernos de anclaje de 1 1/2" diam. x 160 cm | pza | 6.000000 | $96.55 | $579.30 |
| Suma de Material | $2,124.42 | ||||
| Mano de Obra | |||||
| 01-1007-18 | Cuadrilla No. 7: oficial especialista + ayudante >>Procesista >>Rend=2 pza/jor | jor | 0.500000 | $674.55 | $337.28 |
| 01-1002-160 | Cuadrilla No. 2: peon + 1/10 cabo >>Colocacion >>Rend=1.25 pza/jor | jor | 0.800000 | $265.42 | $212.34 |
| 01-1035-06 | Operario especialista (soldador de primera) >>Rend=2 pza/jor | jor | 0.500000 | $445.73 | $222.87 |
| Suma de Mano de Obra | $772.48 | ||||
| Herramienta | |||||
| 00-0000-00 | Herramienta menor | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| 03-0140-007 | Compresor de 375 pcm, 122 hpmod. xa 175 atlas copco (chicago pneumatic de 315 pcm 140 HP) >>PH=1.2 pza/hr | hora | 0.833300 | $169.44 | $141.19 |
| 03-0230-05 | Dobladora y cortadora de lamina y placa hasta 25mm de espesor Espamex PT 50-50 >>PH=1.3 pza/hr | hora | 0.769200 | $157.72 | $121.32 |
| 03-0231-05 | Taladro electrico manual bosh mod. 1182 >>PH=2.85 pza/hr | hora | 0.350900 | $1.72 | $0.60 |
| 03-0180-08 | Soldadora Lincoln SAE 300 amp. K1277 mot. Perkins 4236, 4 cil., 60 HP, 1600 rpm, (sin operador). >>PH=1.10 pza/hr | hora | 0.909100 | $63.52 | $57.75 |
| 03-0214-08 | Camioneta Pick-Up Ford F-250 8 cilindros 1.5 ton. 85 HP >>PH=3 pza/hr | hora | 0.333300 | $192.02 | $64.00 |
| Suma de Equipo | $384.86 | ||||
| Auxiliar | |||||
| 04-0711-06 | Perfil estructural rectangular P.T.R., incluye valor de adquisicion, carga + descarga + acarreo al 1er. km y 9 kms. subsecuentes. >>6.5404.54 kg/m*1.03desp=44.6109 kg | kg | 44.610900 | $11.32 | $505.00 |
| 04-0106-02 | Concreto f'c=200 kg/cm2 hecho in-situ agreg. max. 38mm producidos por el contratista. >>0.4m*0.4m*1.03desp*2=0.3296m3 | m3 | 0.329600 | $1,167.55 | $384.82 |
| 04-0153-00 | Placa de acero A-36; incluye valor de adquisición carga + descarga + acarreo al 1er. km. y 49 kms. subsecuentes. | kg | 23.900000 | $13.82 | $330.30 |
| 04-0157-12 | Lamina galvanizada cal. 16; incluye va- lor de adquisicion carga + descarga + acarreo al 1er km y 49kms. subsecuentes. >>1.602m2*12.206kg/m2*1.03deps=20.1406 kg | ton | 0.020100 | $16,873.03 | $339.15 |
| Suma de Auxiliar | $1,559.27 | ||||
| Costo Directo | $4,841.02 |