| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| BOQUILLA | BOQUILLA SIN ARENA WHITE PEARL CAJA 5 KG (RDTO. 13 M2/CAJA) | caja | 0.020000 | $68.70 | $1.37 |
| Suma de Material | | | | $1.37 |
| Concepto | | | | |
| 03-03 | ANCLAJE CON VARILLA ROSCADA HIT 1/2" X 4 1/4" Y ADHESIVO EPOXICO HIT HY150 TODO MCA. HILTI, INCLUYE: PERFORACION DE MURO, TUERCA Y RONDANA PLANA, MATERIALES, MANO DE OBRA ESPECIALIZADA Y HERRAMIENTA MENOR. | pieza | 12.000000 | $95.53 | $1,146.36 |
| CK1,K5 | CASTILLO DE CONCRETO SECCION= 15 X 15 CM, (ESPESOR X ANCHO) CONCRETO F'C=200 KG/CM2-3/4", CIMBRA 2 CARAS, REFORZADO CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A/C 20 CM | ml | 0.600000 | $147.60 | $88.56 |
| 040772 | MURO DE TABIQUE EN BARRO ROJO RECOCIDO DE 7 X 14 X 28 CM EN 14 CM DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4 JUNTAS DE 1.5 CM ACABADO COMUN HASTA 3.00 m. ALTURA MAXIMA. INCLUYE: MATERIALES DE CONSUMO, TORRE DE TRABAJO, COSTO POR MANO DE OBRA; EQUIPO Y HERRAMIENTA. | m2 | 2.760000 | $269.55 | $743.96 |
| 06-12 | RELLENO DE TEPEZIL EN DESNIVELES DE LOSA DE ENTREPISO PARA DAR NIVELES DE PISO TERMINADO Y EN AZOTEAS PARA DAR PENDIENTES DEFINITIVAS DE ESCURRIMIENTOS PLUVIALES PROP. 1.4 TEPEZIL CEMENTO | m3 | 0.480000 | $896.17 | $430.16 |
| 041306 | FIRME DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2, AGREGADO MAXIMO 1 1/2" DE 8 CM DE ESPESOR INCLUYE: COSTO POR MANO DE OBRA, ACARREO DEL MATERIAL, TENDIDO Y NIVELADO; USO DE EQUIPO Y HERRAMIENTA. | m2 | 3.420000 | $175.07 | $598.74 |
| 041808 | EMBOQUILLADO EN APLANADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:4 PULIDO CON LLANA METALICA DE 15 CM DE SECCION Y ESPESOR PROMEDIO = 1.5 CM HASTA 3.00 mts. DE ALTURA MAXIMA; INCLUYE: MATERIALES DE CONSUMO, TORRE DE TRABAJO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | ml | 6.300000 | $78.39 | $493.86 |
| 020338 | HABILITADO Y ARMADO DE MALLA DE ACERO 6 X 6-10/10 EN PISOS. INCLUYE:SUMINISTRO, ACARREOS INTERNOS, HABILITADO, ARMADO, COLOCACION, ALAMBRE RECOCIDO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 3.420000 | $33.55 | $114.74 |
| 041755 | REPELLADO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4 EN AREAS DONDE SE RETIRO LAMBRIN, ESPESOR PROMEDIO = 3.5 CM HASTA 3.50 mts. DE ALTURA MAXIMA; INCLUYE: MALLA DE GALLINERO, REPELLADO PULIDO CON PLANA, MATERIALES DE CONSUMO, TORRE DE TRABAJO, COSTO POR MANO DE OBRA, EQUIPO Y HERRAMIENTA. | m2 | 1.140000 | $180.08 | $205.29 |
| FORRADO ESTRADO | FORRADO CON LOSETA INTERCERAMIC MODELO BARCELONA COLOR WHITE JUNTEADO CON BOQUILLA EPOXICA | m2 | 5.340000 | $592.27 | $3,162.72 |
| Suma de Concepto | | | | $6,984.39 |
| Costo Directo | | | | $6,985.76 |