| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| ALB.240 | MESETAS DE CONCRETO ARMADO CON MALLA 6X6/6-6 DE HASTA 60 cm. DE ANCHO F'C=200 KG/CM2 DE 7.5 CM. DE ESPESOR INCL. FORRO DE MARMOL BOLEADO AL FRENTE ADHERIDO CON PEGAMARMOL, ZOCLO DE 10 CMS.Y FALDON DE 20 CMS. EN MARMOL NEGRO . INCLUYE: MATERIALES DE CONSUMO, MANO DE OBRA, HERRAMIENTAS Y DEMÁS CARGOS CORRESPONDIENTES POR UNIDAD DE OBRA TERMINADA | ml |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CIMBRA 04 | MADERA PINO 3a. | PT** | 3.500000 | $6.00 | $21.00 |
| CIMBRA 04 | MADERA PINO 3a. | PT** | 3.500000 | $6.00 | $21.00 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2** | 0.250000 | $80.63 | $20.16 |
| CIMBRA 01 | CIMBRAPLAY 16 MM | M2** | 0.250000 | $80.63 | $20.16 |
| CIMBRA 03 | CHAFLAN | ML** | 2.000000 | $2.50 | $5.00 |
| CIMBRA 03 | CHAFLAN | ML** | 2.000000 | $2.50 | $5.00 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg.** | 0.500000 | $19.13 | $9.57 |
| CIMBRA 02 | CLAVO (VARIAS MED.) | Kg.** | 0.500000 | $19.13 | $9.57 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.250000 | $10.00 | $2.50 |
| CIMBRA-03 | DESMOLDANTE SEPAROL DE SIKA | LT | 0.250000 | $10.00 | $2.50 |
| ACERO-MALL-01 | MALLA ELECTROSOLDAD 6X6-6/6 | M2** | 1.000000 | $25.51 | $25.51 |
| ACERO-MALL-01 | MALLA ELECTROSOLDAD 6X6-6/6 | M2** | 1.000000 | $25.51 | $25.51 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 200 KG/CM2 | M3** | 0.075000 | $685.00 | $51.38 |
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 200 KG/CM2 | M3** | 0.075000 | $685.00 | $51.38 |
| MESETA-MARMOL 01 | MARMOL BOLEADO AL FRENTE ADHERIDO CON PEGAMARMOL, ZOCLO DE 10 CMS.Y FALDON DE 20 CMS. EN MARMOL NEGRO | ML** | 1.000000 | $2,500.00 | $2,500.00 |
| MESETA-MARMOL 01 | MARMOL BOLEADO AL FRENTE ADHERIDO CON PEGAMARMOL, ZOCLO DE 10 CMS.Y FALDON DE 20 CMS. EN MARMOL NEGRO | ML** | 1.000000 | $2,500.00 | $2,500.00 |
| Suma de Material | $5,270.22 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | JOR | 1.000000 | $527.40 | $527.40 |
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | JOR | 1.000000 | $527.40 | $527.40 |
| Suma de Mano de Obra | $1,054.80 | ||||
| Costo Directo | $6,325.02 |