| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 3.1.1 | Fabricaci贸n e instalaci贸n de puertas met谩licas. | PZA |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MA2167 | TUBERIA DE ACERO AL CARBON ASTM A-36 CED 0.375 DE 6" DIAM | M | 4.200000 | $315.00 | $1,323.00 |
| MA2018 | BISAGRA PARA TUBERIA DE ACERO DE 6" | PZA | 4.000000 | $150.00 | $600.00 |
| MA2052 | DISCO ABRASIVO | JGO | 2.000000 | $52.00 | $104.00 |
| MA2169 | TUBERIA DE ACERO AL CARBON ASTM-A36 CED 40 DE 2" DIAM | M | 36.000000 | $165.00 | $5,940.00 |
| MA2146 | SOLDADURA 6010/7018 | KG | 5.000000 | $32.00 | $160.00 |
| MA2123 | OXIGENO | M3 | 2.000000 | $50.00 | $100.00 |
| MA2005 | ACETILENO | KG | 0.400000 | $95.00 | $38.00 |
| MA2163 | TUBERIA DE 2 3/8" CED 40 DE ACERO AL CARBON | M | 0.400000 | $365.00 | $146.00 |
| MA2128 | PINTURA EPOXICO ALTOS SOLIDOS RA-28 | LTO | 1.890000 | $97.00 | $183.33 |
| MA2130 | PINTURA PRIMARIO INORGANICA DE ZINC AUTOCURANTE | LTO | 1.570000 | $78.00 | $122.46 |
| MA2129 | PINTURA EPOXICO CATALIZADO ALTOS SOLIDOS RA-26 | LTO | 2.520000 | $92.00 | $231.84 |
| MA2014 | ARENA SILICA | TON | 0.140000 | $678.00 | $94.92 |
| MA2034 | CARDA DE ALAMBRE DE ACERO | PZA | 0.300000 | $110.00 | $33.00 |
| Suma de Material | $9,076.55 | ||||
| Mano de Obra | |||||
| MO001 | AYUDANTE GENERAL | JOR | 0.415000 | $308.92 | $128.20 |
| MO004 | CABO DE OFICIOS | JOR | 0.200000 | $852.29 | $170.46 |
| MO019 | SOLDADOR ESPECIALISTA | JOR | 1.088137 | $933.04 | $1,015.28 |
| MO003 | AYUDANTE SOLDADOR | JOR | 2.660882 | $439.54 | $1,169.56 |
| MO011 | OFICIAL SANBLASTERO | JOR | 0.147436 | $549.55 | $81.02 |
| MO010 | OFICIAL PINTOR | JOR | 0.089525 | $582.74 | $52.17 |
| Suma de Mano de Obra | $2,616.69 | ||||
| Herramienta | |||||
| %MO116 | HERRAMIENTA MANUAL | (%)mo | 0.030000 | $0.00 | $0.00 |
| %MO118 | EQUIPO SEGURIDAD PERSONAL | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| EQTC06 | CAMION CON HIAB 8.0 Tons. | HR | 1.000000 | $549.36 | $549.36 |
| EQTC41 | MOTOSOLDADORA 400 AMP LINCOLN | HR | 16.000000 | $60.25 | $964.00 |
| EQTC45 | PULIDORA, ESMERILADORA INDUSTRIAL | HORA | 26.360153 | $2.61 | $68.80 |
| EQTC20 | EQUIPO DE OXIACETILENO CON MANGUERAS Y ACCESORIOS | HR | 41.194030 | $0.67 | $27.60 |
| EQTC22 | EQUIPO P/APLICACION CHORRO ARENA | HR | 1.332016 | $10.13 | $13.49 |
| EQTC38 | MOTOCOMPRESOR 620 pcm | HR | 0.114501 | $501.70 | $57.45 |
| Suma de Equipo | $1,680.70 | ||||
| Auxiliar | |||||
| ELAB CONC 150 | ELABORACION CONCRETO 150 KG/CM2 | M3 | 0.450000 | $1,009.48 | $454.27 |
| Suma de Auxiliar | $454.27 | ||||
| Costo Directo | $13,828.21 |