| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| FAC-04 | SUMINISTRO Y COLOCACION DE LOSETA CERAMICA ---- INTERCERAMIC PRIMERA PARA COLUMNAS FALSAS, ASENTADA CON ADHESIVO GRIS Y ADITIVO ACRILICO DE ALTO DESEMPEÑO, INCLUYE: ANDAMIOS, HERRAMIENTA, MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| OC-INTER2 | LOSETA CERAMICA TRAVERTINO ROYAL WALNUT 60 X 60 INTERCERAMIC PRIMERA | m2 | 1.030000 | $153.15 | $157.74 |
| OC-INTER2 | LOSETA CERAMICA TRAVERTINO ROYAL WALNUT 60 X 60 INTERCERAMIC PRIMERA | m2 | 1.030000 | $153.15 | $157.74 |
| OC-INTER2 | LOSETA CERAMICA TRAVERTINO ROYAL WALNUT 60 X 60 INTERCERAMIC PRIMERA | m2 | 1.030000 | $153.15 | $157.74 |
| OC-INTER3 | ADHESIVO GRIS INTERCERAMIC DE 20 KG | saco | 0.600000 | $51.00 | $30.60 |
| OC-INTER3 | ADHESIVO GRIS INTERCERAMIC DE 20 KG | saco | 0.600000 | $51.00 | $30.60 |
| OC-INTER3 | ADHESIVO GRIS INTERCERAMIC DE 20 KG | saco | 0.600000 | $51.00 | $30.60 |
| OC-INTER4 | ADITIVO ACRILICO INTERCERAMIC, SUSTITUYE AGUA | galón | 0.600000 | $103.31 | $61.99 |
| OC-INTER4 | ADITIVO ACRILICO INTERCERAMIC, SUSTITUYE AGUA | galón | 0.600000 | $103.31 | $61.99 |
| OC-INTER4 | ADITIVO ACRILICO INTERCERAMIC, SUSTITUYE AGUA | galón | 0.600000 | $103.31 | $61.99 |
| OC-INTER5 | BOQUILLA CON SELLADOR INTERCERAMIC DE 10 KG | saco | 0.083000 | $58.62 | $4.87 |
| OC-INTER5 | BOQUILLA CON SELLADOR INTERCERAMIC DE 10 KG | saco | 0.083000 | $58.62 | $4.87 |
| OC-INTER5 | BOQUILLA CON SELLADOR INTERCERAMIC DE 10 KG | saco | 0.083000 | $58.62 | $4.87 |
| OC-INTER6 | SEPARADORES PLASTICOS DE 3MM PARA LOSETA | pza | 3.000000 | $0.32 | $0.96 |
| OC-INTER6 | SEPARADORES PLASTICOS DE 3MM PARA LOSETA | pza | 3.000000 | $0.32 | $0.96 |
| OC-INTER6 | SEPARADORES PLASTICOS DE 3MM PARA LOSETA | pza | 3.000000 | $0.32 | $0.96 |
| Suma de Material | $768.47 | ||||
| Mano de Obra | |||||
| OC-CUA16 | Cuadrilla (1 Azulejero + 1 Ayudante) | jor | 0.125000 | $1,092.43 | $136.55 |
| OC-CUA16 | Cuadrilla (1 Azulejero + 1 Ayudante) | jor | 0.125000 | $1,092.43 | $136.55 |
| OC-CUA16 | Cuadrilla (1 Azulejero + 1 Ayudante) | jor | 0.125000 | $1,092.43 | $136.55 |
| Suma de Mano de Obra | $409.66 | ||||
| Herramienta | |||||
| OC-ANDAMIOS | Andamios metálicos tipo torre | (%)mo | 0.050000 | $0.00 | $0.00 |
| OC-ANDAMIOS | Andamios metálicos tipo torre | (%)mo | 0.050000 | $0.00 | $0.00 |
| OC-ANDAMIOS | Andamios metálicos tipo torre | (%)mo | 0.050000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Costo Directo | $1,178.13 |