| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | | | | |
| TUBPVCSANIT51 | TUBO DE PVC SANITARIO NORMA CEMENTAR DE 51MM DE DIAMETRO | PZA | 1.000000 | $63.30 | $63.30 |
| ACABADO LAVADO | ACABADO LAVADO EN CONCRETO DE ESCALINATA. | M2 | 3.680000 | $40.00 | $147.20 |
| MALLA ELECTROSOLDADA | MALLA ELECTROSOLDADA 6X6X6/6. | M2 | 3.680000 | $50.00 | $184.00 |
| NARIZ DE CONCRETO | NARIZ DE CONCRETO FORJADA CON MOLDE DE PVC DE 2". | ML | 5.200000 | $60.00 | $312.00 |
| Suma de Material | | | | $706.50 |
| Concepto | | | | |
| 2022 | EXCAVACION A MAQUINA EN MATERIAL TIPO B (TEPETATE) A UNA PROFUNDIDAD MAXIMA DE 1.50 MTS | M3* | 2.000000 | $33.50 | $67.00 |
| 2007 | PLANTILLA DE CONCRETO F'C = 100 KG/CM2, HECHO EN OBRA, RESISTENCIA NORMAL, DE 5 CM. DE ESP. | M2* | 1.680000 | $86.09 | $144.63 |
| 2008 | HABILITADO Y ARMADO DE ACERO DE REFUERZO EN ZAPATAS AISLADAS ,CORRIDAS Y DADOS EN CIMENTACION , RESISTENCIA NORMAL Fy = 4200 KG/CM2, VARIOS DIAMETROS. | KG* | 30.000000 | $13.62 | $408.60 |
| 2010 | CIMBRA COMUN EN CONTRATRABES Y TRABES DE LIGA EN CIMENTACION A BASE DE CIMBRAPLAY Y MADERA DE PINO. | M2* | 1.200000 | $182.42 | $218.90 |
| 2011 | CONCRETO F'c= 250 KG/CM2 PREMEZCLADO RN VACIADO CON BOMBA REV.DE 10-12 AM 3/4" EN ZAPATAS,CONTRATRABES,TRABES DE LIGA Y DADOS . | M3* | 0.480000 | $1,187.02 | $569.77 |
| 2012-A | RELLENO CON MATERIAL DE BANCO Y COMPACTACIÓN DE TERRAPLENES DE RELLENO AL 95% DE SU P.V.S.M. CON MATERIAL LIMPIO DE BANCO PARA CONSTRUCCIÓN DE NIVEL SUBRASANTE EN LOS CORTES EN QUE SE HAYA ORDENADO EXCAVACIÓN ADICIONAL, INCLUYE: TODOS LOS MATERIALES PUESTOS EN SITIO, AGUA, ACARREOS DEL MATERIAL DESDE BANCO Y HASTA EL SITIO DE LA OBRA, EQUIPO Y TODO LO NECESARIO PARA LA CORRECTA EJECUCIÓN DE L CONCEPTO. | M3* | 4.190000 | $194.90 | $816.63 |
| EXT-14 | SUIMINISTRO Y APLICACION DE PINTURA VINILICA , SOBRE TABLAROCA ZONA DE COMENSALES PLAY GROUND,VOLADOS CAJILLOS Y BAJANTES | M2* | 4.000000 | $52.91 | $211.64 |
| 2014 | MURO DE BLOCK 20 x 20 x 40 CM. ASENTADO CON MORTERO CEMENTO ARENA 1: 4 . JUNTAS DE 1.5 CM. ACABADO COMUN. EN CIMENTACION | M2* | 6.070000 | $192.81 | $1,170.36 |
| AL-03 | CASTILLO AHOGADO, CON VARILLAS DE 3/8 EN MUROS DE 15 CMS Y CONCRETO F´C = 200KG/CM2. | ML | 13.000000 | $56.83 | $738.79 |
| AL-04 | CADENA CR-01 SECCION 25 X 20 , DE CONCRETO ARMADO CON 6 VARILLAS DE 1/2 Y ESTRIBOS DE 1/4 @ 15 CMS Y CONRETO DE F´C= 150 KG/CM2 | ML | 5.600000 | $212.97 | $1,192.63 |
| AL-05 | APLANADO FINO CON MORTERO CEM-ARE 1:3 A REGLA ,EN MUROS ESPESOR PROMEDIO DE 2.5 CM. INCLUYE : REPELLADO PULIDO A PLANA . | M2 | 6.070000 | $89.61 | $543.93 |
| O-E-U-11A | RELLENO DE MORTERO C:A 1:5 EN TODOS LOS HUECOS DE LOS MUROS DE BLOCK DE LA CIMENTACION. INCLUYE MATERIAL Y MANO DE OBRA. ( TRABAJO SOLICITADO POR EL CALCULISTA PARA QUE LOS MUROS TRABAGEN COMO DE CARGA ) | M2 | 4.190000 | $208.20 | $872.36 |
| EXT-11 | PISO DE CONCRETO DE 8 CMS DE ESPESOR PARA CUARTO DE BOMBAS Y CUARTO DE BASURA DE 8 CM Y ARMADO CON MALLA 6-6 10-10 ACABADO PULIDO A LLANA INCLUYE : MANO DE OBRA , HERRAMIENTAS , MATERIALES Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION . | M2 | 3.600000 | $191.96 | $691.06 |
| Suma de Concepto | | | | $7,646.30 |
| Costo Directo | | | | $8,352.80 |