| MAC-018 | Madera pino 3a, 1" x 4" x 8.25' | pt | 0.001500 | $9.33 | $0.01 |
| MAC-019 | Madera pino 3a, 2" x 4" x 8.25' | pt | 0.002500 | $9.33 | $0.02 |
| MAC-005 | Cal hl datada, saco 25 kg | ton | 0.000200 | $1,575.08 | $0.32 |
| MAC-021 | Carrete de hilo plastico | m | 0.350000 | $0.24 | $0.08 |
| MAC-022 | Pintura de esmalte comex 100, comex | cub | 0.000100 | $1,242.64 | $0.12 |
| MAC-024 | Acero de refuerzo numero 4, 1/2m | kg | 0.010100 | $9.97 | $0.10 |
| MAC-020 | Clavo de 2 1/2" (6.35cm) de largo | kg | 0.000500 | $21.90 | $0.01 |
| MAC-018 | Madera pino 3a, 1" x 4" x 8.25' | pt | 0.001500 | $9.33 | $0.01 |
| MAC-019 | Madera pino 3a, 2" x 4" x 8.25' | pt | 0.002500 | $9.33 | $0.02 |
| MAC-005 | Cal hl datada, saco 25 kg | ton | 0.000200 | $1,575.08 | $0.32 |
| MAC-021 | Carrete de hilo plastico | m | 0.350000 | $0.24 | $0.08 |
| MAC-022 | Pintura de esmalte comex 100, comex | cub | 0.000100 | $1,242.64 | $0.12 |
| MAC-024 | Acero de refuerzo numero 4, 1/2m | kg | 0.010100 | $9.97 | $0.10 |
| MAC-020 | Clavo de 2 1/2" (6.35cm) de largo | kg | 0.000500 | $21.90 | $0.01 |
| Suma de Material | | | | $1.32 |
| AUXCDTR-055 | Cuadrilla 55 (oficial albañil y dos peones), incluye maestro y mando intermedio | jor | 0.003300 | $2,668.52 | $8.81 |
| AUXCDTR-055 | Cuadrilla 55 (oficial albañil y dos peones), incluye maestro y mando intermedio | jor | 0.003300 | $2,668.52 | $8.81 |
| Suma de Mano de Obra | | | | $17.62 |
| HEC-001 | Herramienta menor | %mo | 3.000000 | $0.00 | $0.00 |
| HEC-001 | Herramienta menor | %mo | 3.000000 | $0.00 | $0.00 |
| Suma de Herramienta | | | | $0.00 |
| EQC-003 | Nivel para medicion k-e, tipo dumpy | hr | 0.019500 | $447.07 | $8.72 |
| EQC-004 | Transito para medicion k-e, modelo | hr | 0.019500 | $447.69 | $8.73 |
| EQC-003 | Nivel para medicion k-e, tipo dumpy | hr | 0.019500 | $447.07 | $8.72 |
| EQC-004 | Transito para medicion k-e, modelo | hr | 0.019500 | $447.69 | $8.73 |
| Suma de Equipo | | | | $34.90 |
| Auxiliar | | | | |
| AUXCNRN-100 | Concreto f'c= 100 kg/cm2, fabricado en obra, resistencia normal, agregado maximo de 3/4", incluye materiales, desperdicios, mano de obra y equipo, revenimiento de 8 a 10 cm | m3 | 0.001200 | $1,933.94 | $2.32 |
| AUXCNRN-100 | Concreto f'c= 100 kg/cm2, fabricado en obra, resistencia normal, agregado maximo de 3/4", incluye materiales, desperdicios, mano de obra y equipo, revenimiento de 8 a 10 cm | m3 | 0.001200 | $1,933.94 | $2.32 |
| Suma de Auxiliar | | | | $4.64 |
| Costo Directo | | | | $58.48 |