Material |
|
|
|
|
MAC-529 |
Poste linea galv, 60 mm, 3.00 m, cp |
pza |
0.097200 |
$250.94 |
$24.39 |
MAC-530 |
Poste eso, galv, 73 mm, 3.10 m, ex |
pza |
0.028300 |
$397.48 |
$11.25 |
MAC-531 |
Retenida horizontal 42 mm, rh, 3 m |
m |
0.340000 |
$53.55 |
$18.21 |
MAC-532 |
Barra superior 42 mm, bs, mallamex |
m |
0.340000 |
$38.34 |
$13.04 |
MAC-533 |
Malla ciclon galv, cal.9, 55 x 55mm |
m2 |
1.050000 |
$72.66 |
$76.29 |
MAC-534 |
Alambre galvanizado calibre 8 |
kg |
0.045000 |
$7.54 |
$0.34 |
MAC-535 |
Alambre puas galvanizado cal, 12.5 |
m |
1.050000 |
$6.37 |
$6.69 |
MAC-529 |
Poste linea galv, 60 mm, 3.00 m, cp |
pza |
0.097200 |
$250.94 |
$24.39 |
MAC-530 |
Poste eso, galv, 73 mm, 3.10 m, ex |
pza |
0.028300 |
$397.48 |
$11.25 |
MAC-531 |
Retenida horizontal 42 mm, rh, 3 m |
m |
0.340000 |
$53.55 |
$18.21 |
MAC-532 |
Barra superior 42 mm, bs, mallamex |
m |
0.340000 |
$38.34 |
$13.04 |
MAC-533 |
Malla ciclon galv, cal.9, 55 x 55mm |
m2 |
1.050000 |
$72.66 |
$76.29 |
MAC-534 |
Alambre galvanizado calibre 8 |
kg |
0.045000 |
$7.54 |
$0.34 |
MAC-535 |
Alambre puas galvanizado cal, 12.5 |
m |
1.050000 |
$6.37 |
$6.69 |
|
Suma de Material |
|
|
|
$300.42 |
|
Mano de Obra |
|
|
|
|
AUXCDTR-087 |
Cuadrilla 87 (oficial especializado y un ayudante clase a), incluye maestro |
jor |
0.037000 |
$2,225.06 |
$82.33 |
AUXCDTR-087 |
Cuadrilla 87 (oficial especializado y un ayudante clase a), incluye maestro |
jor |
0.037000 |
$2,225.06 |
$82.33 |
|
Suma de Mano de Obra |
|
|
|
$164.66 |
|
Herramienta |
|
|
|
|
HEC-002 |
Andamios, pasarelas y escaleras |
%mo |
2.000000 |
$0.00 |
$0.00 |
HEC-001 |
Herramienta menor |
%mo |
5.000000 |
$0.00 |
$0.00 |
HEC-002 |
Andamios, pasarelas y escaleras |
%mo |
2.000000 |
$0.00 |
$0.00 |
HEC-001 |
Herramienta menor |
%mo |
5.000000 |
$0.00 |
$0.00 |
|
Suma de Herramienta |
|
|
|
$0.00 |
|
Concepto |
|
|
|
|
CMTCN75-200 |
Concreto fc= 200 kg/cm2 en cimentacion, tma 3/4″,hecho en obra, vaciado manualmente, vibrado y curado, incluye materiales, desperdicios, mano de obra y equipo |
m3 |
0.006800 |
$5,176.12 |
$35.20 |
CMTCN75-200 |
Concreto fc= 200 kg/cm2 en cimentacion, tma 3/4″,hecho en obra, vaciado manualmente, vibrado y curado, incluye materiales, desperdicios, mano de obra y equipo |
m3 |
0.006800 |
$5,176.12 |
$35.20 |
|
Suma de Concepto |
|
|
|
$70.40 |
|
Costo Directo |
|
|
|
$535.48 |