| MAC-523 | Poste linea galv, 60 mm, 3.50 m, cb | pza | 0.085000 | $280.86 | $23.87 |
| MAC-524 | Poste esq, galv, 73 mm, 3.60 m, cs | pza | 0.056700 | $480.21 | $27.23 |
| MAC-525 | Retenida horizontal 40 mm, rh, 3 m | m | 0.340000 | $42.43 | $14.43 |
| MAC-526 | Barra superior 40 mm, bs, mallamex | m | 0.340000 | $34.62 | $11.77 |
| MAC-527 | Malla ciclon galv, c.10.5 55 x 55mm | m2 | 1.050000 | $54.10 | $56.81 |
| MAC-528 | Alambre galvanizado calibre 10 | kg | 0.035000 | $7.54 | $0.26 |
| MAC-523 | Poste linea galv, 60 mm, 3.50 m, cb | pza | 0.085000 | $280.86 | $23.87 |
| MAC-524 | Poste esq, galv, 73 mm, 3.60 m, cs | pza | 0.056700 | $480.21 | $27.23 |
| MAC-525 | Retenida horizontal 40 mm, rh, 3 m | m | 0.340000 | $42.43 | $14.43 |
| MAC-526 | Barra superior 40 mm, bs, mallamex | m | 0.340000 | $34.62 | $11.77 |
| MAC-527 | Malla ciclon galv, c.10.5 55 x 55mm | m2 | 1.050000 | $54.10 | $56.81 |
| MAC-528 | Alambre galvanizado calibre 10 | kg | 0.035000 | $7.54 | $0.26 |
| Suma de Material | | | | $268.74 |
| AUXCDTR-087 | Cuadrilla 87 (oficial especializado y un ayudante clase a), incluye maestro | jor | 0.037000 | $2,225.06 | $82.33 |
| AUXCDTR-087 | Cuadrilla 87 (oficial especializado y un ayudante clase a), incluye maestro | jor | 0.037000 | $2,225.06 | $82.33 |
| Suma de Mano de Obra | | | | $164.66 |
| HEC-002 | Andamios, pasarelas y escaleras | %mo | 2.000000 | $0.00 | $0.00 |
| HEC-001 | Herramienta menor | %mo | 5.000000 | $0.00 | $0.00 |
| HEC-002 | Andamios, pasarelas y escaleras | %mo | 2.000000 | $0.00 | $0.00 |
| HEC-001 | Herramienta menor | %mo | 5.000000 | $0.00 | $0.00 |
| Suma de Herramienta | | | | $0.00 |
| Concepto | | | | |
| CMTCN75-200 | Concreto fc= 200 kg/cm2 en cimentacion, tma 3/4",hecho en obra, vaciado manualmente, vibrado y curado, incluye materiales, desperdicios, mano de obra y equipo | m3 | 0.008800 | $5,176.12 | $45.55 |
| CMTCN75-200 | Concreto fc= 200 kg/cm2 en cimentacion, tma 3/4",hecho en obra, vaciado manualmente, vibrado y curado, incluye materiales, desperdicios, mano de obra y equipo | m3 | 0.008800 | $5,176.12 | $45.55 |
| Suma de Concepto | | | | $91.10 |
| Costo Directo | | | | $524.50 |