Clave | Descripción del Análisis de Precio Unitario | Unidad |
H501300-1100 | Plafon armstrong second look I 0.61×1.22 m. s/p, suspension armstrong, Hasta 14.00 m. de altura. incluye: acarreos a 1a. estacion a 20m. | m2 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
125100-1110 | Alambron 1/4″ No. 2 marca San Luis | Ton | 0.000200 | $17,241.38 | $3.45 |
175125-5200 | Tornillo 6cm x 1 5/8″ cs mil punta fina | pza | 2.000000 | $0.13 | $0.26 |
500300-2135 | Alambre galvanizado Ferretero Calibre 14.5,rollo 100 kg marca De Acero | kg | 0.120000 | $13.59 | $1.63 |
500300-2070 | Angulo perimetral 3.66 ml 15/16 | pza | 0.650000 | $74.12 | $48.18 |
500300-2100 | Te principal armstrong 15/16 3.66 ml | pza | 0.900000 | $108.07 | $97.26 |
500300-2110 | Te secundaria armstrong 15/16 0.61 ml | pza | 1.700000 | $17.54 | $29.82 |
500300-1100 | Plafon Cortega sec look I .61×1.22×3/4″ | pza | 1.350000 | $113.95 | $153.83 |
Suma de Material | $334.43 | ||||
Mano de Obra | |||||
A100130-1565 | Cuadrilla de yeseros en mantenimiento. Incluye : yesero, ayudante, cabo, oficial contra incendios, herramienta y factor de higiene y seguridad. | Jor | 0.220600 | $1,087.43 | $239.89 |
Suma de Mano de Obra | $239.89 | ||||
Auxiliar | |||||
F990105-2025 | Andamio de acero tubular de 12.00m. de altura con ruedas y base de madera a base de tablones de madera de pino de 2a. | r/d | 0.253700 | $128.22 | $32.53 |
Suma de Auxiliar | $32.53 | ||||
Costo Directo | $606.85 |