| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| E07.010 | Mostrador en cooperativa barra de concreto f'c=150 kg/cm2 de 594x40x8cm muros tabique aplanado, puertas triplay pino barnizadas altura de 0.979 m, fabricaci贸n y colocaci贸n. | pza |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| MATE-374 | Resistol 850 | l | 0.400000 | $73.52 | $29.41 |
| MATE-107 | Clavo de 1" | kg | 0.130000 | $24.48 | $3.18 |
| MATE-99 | Chafl谩n de madera de pino de 3a. de 1" | m | 4.000000 | $2.64 | $10.56 |
| MATE-325 | Pasador de barra de acero cromado 100mm marca TRUPER modelo PAC 37 | pza | 1.000000 | $49.00 | $49.00 |
| MATE-297 | Madera de pino de 1a. | PT | 7.400000 | $24.19 | $179.01 |
| MATE-29 | Barniz 3000 brillante transparente POLIFORM | l | 1.800000 | $112.07 | $201.73 |
| MATE-19 | Alambre recocido del No.18 | kg | 0.142000 | $12.50 | $1.78 |
| MATE-540 | Varilla fy=4200 kg/cm2 No.3 (3/8") | kg | 16.377000 | $9.50 | $155.58 |
| MATE-454 | Triplay de madera de pino de 1a. y 6 mm de espesor | m2 | 2.700000 | $55.70 | $150.39 |
| MATE-389 | Tabic贸n de concreto ligero de 7x12x24 cm | mill | 0.330000 | $1,710.00 | $564.30 |
| MATE-33 | Bisagra lat贸n 2 rectangular blister hermex marca TRUPER MODELO BR-201B | pza | 2.000000 | $10.00 | $20.00 |
| MATE-283 | Lija para madera gruesa | pza | 0.250000 | $3.50 | $0.88 |
| Suma de Material | $1,365.82 | ||||
| Mano de Obra | |||||
| 00-M0013 | Cuadrilla 13 (Carpintero de Banco + Ayudante) | jor | 0.750000 | $903.29 | $677.47 |
| 00-M0002 | Cuadrila 02 (Alba帽il + Ayudante) | jor | 0.600000 | $826.86 | $496.12 |
| Suma de Mano de Obra | $1,173.59 | ||||
| Auxiliar | |||||
| E00.020 | Mortero cemento-arena 1:5 | m3 | 0.203000 | $817.93 | $166.04 |
| E00.012 | Cimbra limite losa piso | m2 | 1.014000 | $106.18 | $107.67 |
| E00.016 | Concreto f'c=150 kg/cm2 | m3 | 0.380000 | $1,073.49 | $407.93 |
| E00.021 | Mortero cemento-cal-arena 1:2:6 | m3 | 0.165000 | $1,103.54 | $182.08 |
| E00.013 | Cimbra para mueble concreto | m2 | 3.100000 | $219.74 | $681.19 |
| Suma de Auxiliar | $1,544.91 | ||||
| Costo Directo | $4,084.32 |