| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| A15030A035 | Estructuras de concreto estructuras de concreto presforzado, por unidad de obra terminada por pieza fabricada y montada: -de f'c=350 kg/cm2 en trabes cajon presforzada. | ton |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| BPRES0155 | Cable merlusa 6 x 36 de 3/4" | kg | 7.259000 | $125.66 | $912.17 |
| BFERR0761 | Caseton p/cimbra poliestireno expandido 50x60x15cm | PZA | 1.077300 | $17.61 | $18.97 |
| ACACT055 | Cemento Tolteca CPC 30 R (cemento portland compuesto) | t | 0.004500 | $1,373.91 | $6.18 |
| BADIT1177 | Emulsificante fbr fester | kg | 1.046700 | $25.46 | $26.65 |
| AIGFE030 | Cimbrafest 19 lt | pza | 0.048100 | $373.30 | $17.96 |
| ACMXX005 | Agua | m3 | 0.010500 | $85.00 | $0.89 |
| MACMF150 | Polin 3 1/4"x3 1/4"x8 1/4' | pt | 0.974300 | $6.20 | $6.04 |
| Suma de Material | $988.86 | ||||
| Mano de Obra | |||||
| 1AABO | Albañil | Jor | 0.216600 | $372.63 | $80.71 |
| 1AA00 | Peón | Jor | 0.216600 | $227.31 | $49.24 |
| 1AZC1 | Cabo de oficiales | jor | 0.002200 | $518.10 | $1.14 |
| Suma de Mano de Obra | $131.09 | ||||
| Herramienta | |||||
| 2HER | Herramienta menor | (%)mo | 0.000300 | $131.09 | $0.04 |
| Suma de Herramienta | $0.04 | ||||
| Equipo | |||||
| EQHA135-500 | Grua hidráulica con motor a diesel de 225h.p. pluma telescopica hasta 57mts. 72ton. de carga mca. grove mod. rt-880 | hr | 0.029600 | $583.55 | $17.27 |
| Suma de Equipo | $17.27 | ||||
| Auxiliar | |||||
| A15020A665 | Vaciado, colado, vibrado cuerpo de estructura | m3 | 0.411800 | $339.51 | $139.81 |
| A15020A675 | Curado superficies concreto | m2 | 3.638000 | $6.63 | $24.12 |
| Suma de Auxiliar | $163.93 | ||||
| Concepto | |||||
| A15020A080 | Moldes y/o cimbra metalica p/trabe cajon precolada | m2 | 2.303400 | $142.89 | $329.13 |
| HA159 | Suministro, habilitado, colocacion acero rfrzo vars no 2 (1/4") fy=2650 kg/cm2 | kg | 3.000000 | $15.14 | $45.42 |
| HA161 | Suministro, habilitado, colocacion acero rfrzo vars no 3-8 (3/8"-1") fy=4200 kg/cm2 | kg | 102.900002 | $14.27 | $1,468.38 |
| A15025B045 | Acero de presfuerzo le>19,000 kg/cm2 | kg | 8.200000 | $42.90 | $351.78 |
| A15020A100 | Suministro, habilitado, colocacion malla electrosoldada 6x6-4/4 | kg | 1.815100 | $13.87 | $25.18 |
| A15035A055 | Suministro, habilitado, colocacion acero estruc placa a-36 | kg | 3.527000 | $23.31 | $82.21 |
| A15035A060 | Suministro, habilitado, colocacion acero estruc lig redondo (rdo) a-36 | kg | 2.614200 | $23.57 | $61.62 |
| A10060A025 | Concreto f'c=350 kg/cm2, r.n., tma 19mm (3/4"), hecho en obra planta premezclado | m3 | 0.411800 | $873.17 | $359.57 |
| A15030A055 | Montaje estruc conc presforzado (cajon) | ton | 1.000000 | $265.81 | $265.81 |
| Suma de Concepto | $2,989.10 | ||||
| Costo Directo | $4,290.29 |