|
Material |
|
|
|
|
MAC143 |
Tornillo galvanizado de 3″ x 1/8″ |
pza |
2.000000 |
$0.38 |
$0.76 |
MAC77 |
Estopa |
kg |
0.020000 |
$37.50 |
$0.75 |
MAC12 |
Adelgazador thinner |
l |
0.200000 |
$45.91 |
$9.18 |
MAC125 |
Primario Anticorrosivo |
l |
0.100000 |
$104.31 |
$10.43 |
MAC197 |
Papel Kraft |
kg |
0.020000 |
$10.95 |
$0.22 |
MAC34 |
Bajo alfombra poli-pad |
m2 |
0.050000 |
$13.79 |
$0.69 |
MAC135 |
Soldadura E-7018 |
kg |
0.060000 |
$35.00 |
$2.10 |
MAC127 |
Scotch lite grado ingenieria naranja |
m2 |
1.020000 |
$177.93 |
$181.49 |
MAC131 |
Scotch lite grado ingenieria negro |
m2 |
0.900000 |
$177.93 |
$160.14 |
|
Suma de Material |
|
|
|
$365.76 |
|
Mano de Obra |
|
|
|
|
CUC7 |
Cuadrilla No. 7: oficial especialista + ayudante |
jor |
0.135000 |
$871.23 |
$117.62 |
CUC2 |
Cuadrilla No. 2: peón + 1/10 cabo |
jor |
0.135000 |
$342.67 |
$46.26 |
MOC34 |
Operario especialista |
jor |
0.135000 |
$575.85 |
$77.74 |
|
Suma de Mano de Obra |
|
|
|
$241.62 |
|
Herramienta |
|
|
|
|
HEC1 |
Herramienta menor |
(%)mo |
0.030000 |
$241.62 |
$7.25 |
|
Suma de Herramienta |
|
|
|
$7.25 |
|
Equipo |
|
|
|
|
CHC119 |
Compresor de 375 pcm, 122 hpmod. xa 175 atlas copeo (chicago pneumatic de 315 pcm 140 HP) |
hr |
0.096400 |
$190.37 |
$18.35 |
CHC120 |
Dobladora y cortadora de lamina y placa hasta 25mm de espesor Espamex PT 50-50 |
hr |
0.135000 |
$172.18 |
$23.24 |
CHC121 |
Taladro eléctrico manual bosh mod. 1182 |
hr |
0.067500 |
$1.87 |
$0.13 |
CHC81 |
Soldadora Lincoln SAE 300 amp. K1277 mot. Perkins 4236, 4 cil., 60 HP, 1600 rpm., (sin operador). |
hr |
0.168800 |
$103.23 |
$17.43 |
CHC114 |
Camioneta Pick-Up Ford F-250 8 cilindros 1.5 ton. 85 HP |
hr |
0.061400 |
$265.87 |
$16.32 |
|
Suma de Equipo |
|
|
|
$75.47 |
|
Auxiliar |
|
|
|
|
AUC52 |
2) En material “B” |
m3 |
0.080000 |
$163.53 |
$13.08 |
AUC48 |
Lamina galvanizada cal. 16; incluye valor de adquisición carga + descarga + acarreo al 1er km y 49kms. subsecuentes. |
t |
0.010400 |
$14,461.76 |
$150.40 |
AUC63 |
Perfil estructural rectangular P.T.R., incluye valor de adquisicion, carga + descarga + acarreo al 1er. km y 9 kms. subsecuentes. |
kg |
18.704800 |
$14.17 |
$265.05 |
AUC301 |
Concreto f’c = 200 kg/cm² hecho in-situ agreg. max. 38mm producidos por el contratista. |
m3 |
0.080000 |
$1,457.02 |
$116.56 |
|
Suma de Auxiliar |
|
|
|
$545.09 |
|
Costo Directo |
|
|
|
$1,235.19 |