| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| A15045A040 | Banqueta sobre losa tipo iv, p.u.o.t. | m |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| AIGFE030 | Cimbrafest 19 lt | pza | 0.016300 | $373.30 | $6.08 |
| BTUCA0012 | Tuberia carton 21cm rojo (sonotubo) | M | 2.050000 | $21.33 | $43.73 |
| Suma de Material | $49.81 | ||||
| Mano de Obra | |||||
| 1AABO | Albañil | Jor | 0.155500 | $372.63 | $57.94 |
| 1AA00 | Peón | Jor | 0.155500 | $227.31 | $35.35 |
| 1AZC1 | Cabo de oficiales | jor | 0.015600 | $518.10 | $8.08 |
| Suma de Mano de Obra | $101.37 | ||||
| Herramienta | |||||
| 2HER | Herramienta menor | (%)mo | 0.000300 | $101.37 | $0.03 |
| Suma de Herramienta | $0.03 | ||||
| Auxiliar | |||||
| A10080A055 | Vaciado, colado, vibrado guarniciones | m3 | 0.290500 | $233.75 | $67.90 |
| A15020A675 | Curado superficies concreto | m2 | 0.280000 | $6.63 | $1.86 |
| Suma de Auxiliar | $69.76 | ||||
| Concepto | |||||
| HA161 | Suministro, habilitado, colocacion acero rfrzo vars no 3-8 (3/8"-1") fy=4200 kg/cm2 | kg | 41.730000 | $14.27 | $595.49 |
| A10080A005 | Cimbra aparente para guarniciones | m2 | 0.280000 | $105.74 | $29.61 |
| HA171 | Concreto f'c=150 kg/cm2, r.n., tma 19mm (3/4"), hecho en obra c/revolvedora | m3 | 0.171700 | $755.68 | $129.75 |
| HA173 | Concreto f'c=250 kg/cm2, r.n., tma 19mm (3/4"), hecho en obra c/revolvedora | m3 | 0.118800 | $824.71 | $97.98 |
| Suma de Concepto | $852.83 | ||||
| Costo Directo | $1,073.80 |