Material |
|
|
|
|
MAC105 |
Monten en canal 6″ x 6″ cal. 6 |
kg |
353.702000 |
$14.20 |
$5,022.57 |
MAC106 |
Monten en canal 10″ x 10″ cal. 6 |
kg |
28.191100 |
$14.20 |
$400.31 |
MAC198 |
Placa de acero de 3/4″ >>0.5m*0.5m*149.38kg/m2*1.03desp*2=>>76.9307kg |
kg |
76.930700 |
$13.45 |
$1,034.72 |
MAC37 |
Birlo de 1″ diam. 12″ prof. galv. |
pza |
12.000000 |
$119.99 |
$1,439.88 |
MAC77 |
Estopa |
kg |
3.500000 |
$37.50 |
$131.25 |
MAC12 |
Adelgazador thinner |
l |
20.000000 |
$45.91 |
$918.20 |
MAC125 |
Primario Anticorrosivo |
l |
1.900000 |
$104.31 |
$198.19 |
MAC135 |
Soldadura E-7018 |
kg |
8.000000 |
$35.00 |
$280.00 |
MAC128 |
Scotch lite grado ingenieria blanco |
m2 |
2.250000 |
$177.93 |
$400.34 |
MAC34 |
Bajo alfombra poli-pad |
m2 |
0.900000 |
$13.79 |
$12.41 |
MAC197 |
Papel Kraft |
kg |
0.300000 |
$10.95 |
$3.29 |
MAC109 |
Pernos de anclaje de 1 1/2″ diam. x 160 cm |
pza |
4.000000 |
$165.30 |
$661.20 |
|
Suma de Material |
|
|
|
$10,502.36 |
|
Mano de Obra |
|
|
|
|
CUC7 |
Cuadrilla No. 7: oficial especialista + ayudante |
jor |
2.000000 |
$871.23 |
$1,742.46 |
CUC2 |
Cuadrilla No. 2: peón + 1/10 cabo |
jor |
1.344400 |
$342.67 |
$460.69 |
MOC34 |
Operario especialista |
jor |
2.000000 |
$575.85 |
$1,151.70 |
|
Suma de Mano de Obra |
|
|
|
$3,354.85 |
|
Herramienta |
|
|
|
|
HEC1 |
Herramienta menor |
(%)mo |
0.030000 |
$3,354.85 |
$100.65 |
|
Suma de Herramienta |
|
|
|
$100.65 |
|
Equipo |
|
|
|
|
CHC119 |
Compresor de 375 pcm, 122 hpmod. xa 175 atlas copeo (chicago pneumatic de 315 pcm 140 HP) |
hr |
1.052200 |
$190.37 |
$200.31 |
CHC120 |
Dobladora y cortadora de lamina y placa hasta 25mm de espesor Espamex PT 50-50 |
hr |
1.390800 |
$172.18 |
$239.47 |
CHC121 |
Taladro eléctrico manual bosh mod. 1182 |
hr |
0.578900 |
$1.87 |
$1.08 |
CHC81 |
Soldadora Lincoln SAE 300 amp. K1277 mot. Perkins 4236, 4 cil., 60 HP, 1600 rpm., (sin operador). |
hr |
1.728600 |
$103.23 |
$178.44 |
CHC114 |
Camioneta Pick-Up Ford F-250 8 cilindros 1.5 ton. 85 HP |
hr |
0.870500 |
$265.87 |
$231.44 |
|
Suma de Equipo |
|
|
|
$850.74 |
|
Auxiliar |
|
|
|
|
AUC63 |
Perfil estructural rectangular P.T.R., incluye valor de adquisicion, carga + descarga + acarreo al 1er. km y 9 kms. subsecuentes. |
kg |
196.400400 |
$14.17 |
$2,782.99 |
AUC45 |
Placa de acero A-36; incluye valor de adquisición carga + descarga + acarreo al 1er. km. y 49 kms. subsecuentes. |
kg |
36.928000 |
$13.88 |
$512.56 |
AUC48 |
Lamina galvanizada cal. 16; incluye valor de adquisición carga + descarga + acarreo al 1er km y 49kms. subsecuentes. |
t |
0.140300 |
$14,461.76 |
$2,028.98 |
AUC301 |
Concreto f’c = 200 kg/cm² hecho in-situ agreg. max. 38mm producidos por el contratista. |
m3 |
0.741600 |
$1,457.02 |
$1,080.53 |
|
Suma de Auxiliar |
|
|
|
$6,405.06 |
|
Costo Directo |
|
|
|
$21,213.66 |