Clave | Descripción del Análisis de Precio Unitario | Unidad |
2068-64 | SUMINISTRO E INSTALACION DE ACERO ESTRUCTURAL A-36 PERFILES LAMINADOS (ANGULO DE 1 1/2″ x 1/4″ Y 1″ x 1/4″) EN TAPAS DE REGISTROS, PARA RECIBIR REJILLA IRVING INCLUYE HERRAMIENTA, EQUIPO, MATERIAL Y MANO DE OBRA NECESARIA | KG |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
ANGULO 1/4″ X 1 1/2″ | ANGULO DE 1/4″ x 1 1/2″ x 1 1/2″ | KG | 0.550000 | $20.00 | $11.00 |
ANGULO 1/4″ X 1″ 1 | ANGULO DE 1/4″ x 1″ x 1″ | KG | 0.550000 | $20.00 | $11.00 |
ACETILENO 1 | ACETILENO | KG | 0.046000 | $130.00 | $5.98 |
OXIGENO 1 | OXIGENO | M3 | 0.049000 | $39.00 | $1.91 |
SOLDADURA E-6010 1 | SOLDADURA E-6010 | KG | 0.080000 | $49.88 | $3.99 |
PINTURA ANTICORR 1 | PINTURA ANTICORROSIVA | LTO | 0.020000 | $90.00 | $1.80 |
ADITIVO ANTIRUST 1 | ADITIVO PARA FRENAR CORROSION ANTIRUST | LTO | 0.015000 | $80.00 | $1.20 |
Suma de Material | $36.88 | ||||
Mano de Obra | |||||
CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.001200 | $307.31 | $0.37 |
OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.012000 | $251.32 | $3.02 |
AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.012000 | $197.97 | $2.38 |
OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 0.012000 | $185.16 | $2.22 |
Suma de Mano de Obra | $7.99 | ||||
Herramienta | |||||
HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $7.99 | $0.24 |
Suma de Herramienta | $0.24 | ||||
Equipo | |||||
PLANTA SOLDAR 1 | PLANTA DE SOLDAR DE GASOLINA | HORA | 0.025000 | $113.61 | $2.84 |
EQUIPO CORTE OX 1 | EQUIPO DE CORTE OXIACETILENO | HORA | 0.025000 | $26.43 | $0.66 |
EQ SANDBLAST 1 | EQUIPO PARA SANDBAST CON ACCESORIOS | HORA | 0.025000 | $16.28 | $0.41 |
Suma de Equipo | $3.91 | ||||
Costo Directo | $49.02 |