| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2068-14 | FABRICACION DE AJUSTADORES EN ACERO AL CARBON PARA ALINEAR Y SOLDAR TUBERIA DE ACERO AL CARBON DE 5/8" x 54" x 0.40 M INCLUYE TORNILLOS RESTIRADORES, BISAGRAS DOBLES | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| TUBO ACERO 54" 1 | TUBO DE ACERO CED-80 DE 54" DE DIAMETRO | M | 0.750000 | $32,500.00 | $24,375.00 |
| FL AC CO RO 2"X24 M | FLECHA DE ACERO COLD ROLL DE 2" x 24.00 M | KG | 381.600000 | $17.00 | $6,487.20 |
| TUBO REF 2" C-80 1 | TUBERIA REFORZADA DE CED-80 DE 2" DE DIAMETRO SIN COSTURA | M | 4.000000 | $212.32 | $849.28 |
| SOLERA 1"X6"X12 M 1 | SOLERA 1" x 6" x 12.00 M | KG | 151.800000 | $16.00 | $2,428.80 |
| BARRA HUE ACERO 1 | BARRA HUECA DE ACERO DE 3" x 1 1/4" x 1.00 M | M | 1.000000 | $1,500.00 | $1,500.00 |
| ACETILENO 1 | ACETILENO | KG | 0.670000 | $130.00 | $87.10 |
| OXIGENO 1 | OXIGENO | M3 | 1.330000 | $39.00 | $51.87 |
| SOLDADURA E-7018 1 | SOLDADURA E-7018 | KG | 20.000000 | $49.88 | $997.60 |
| THINER 1 | THINER PARA PINTURA EPOXIMASTIC | LTO | 4.000000 | $40.00 | $160.00 |
| MAS DESECHABLES 1 | MASCARILLA DESECHABLES | PZA | 1.000000 | $11.30 | $11.30 |
| CAP ALG PINTAR 1 | CAPUCHA DE ALGODON PARA PINTAR (SPRAY SOCK) | PZA | 1.000000 | $34.00 | $34.00 |
| LENTES DE SEG 1 | LENTE DE SEGURIDAD | PZA | 1.000000 | $46.80 | $46.80 |
| LIJA GRUESA 1 | LIJA GRUESA | PZA | 4.000000 | $11.00 | $44.00 |
| PINTURA EPOXICA 1 | PRIMARIO EPOXICO RP-6 | LTO | 2.000000 | $85.00 | $170.00 |
| TORNILLO 1 1/2"X8" 1 | TORNILLO DE 1 1/2" x 8" | PZA | 3.000000 | $368.00 | $1,104.00 |
| Suma de Material | $38,346.95 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.400000 | $307.31 | $122.92 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 4.000000 | $251.32 | $1,005.28 |
| AYUDANTE OP ESP 1 | AYUDANTE OPERARIO ESPECIALISTA | JOR | 4.000000 | $195.39 | $781.56 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 4.000000 | $197.97 | $791.88 |
| OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 8.000000 | $185.16 | $1,481.28 |
| Suma de Mano de Obra | $4,182.92 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $4,182.92 | $125.49 |
| Suma de Herramienta | $125.49 | ||||
| Equipo | |||||
| PLANTA DE LUZ 1 | PLANTA DE LUZ DE 15 KW | HORA | 16.000000 | $39.75 | $636.00 |
| PLANTA SOLDAR 1 | PLANTA DE SOLDAR DE GASOLINA | HORA | 16.000000 | $113.61 | $1,817.76 |
| TORNO PARALEO 1 | TORNO PARALEO INCLUYE TROMPO CONTRAPUNTO Y HERRAMIENTA | HORA | 8.000000 | $655.14 | $5,241.12 |
| EQUIPO CORTE OX 1 | EQUIPO DE CORTE OXIACETILENO | HORA | 16.000000 | $26.43 | $422.88 |
| CAMION PLATAF 3 T 1 | CAMION PLATAFORMA FORD DE 3 TON DE CAPACIDAD | HORA | 4.000000 | $202.91 | $811.64 |
| Suma de Equipo | $8,929.40 | ||||
| Costo Directo | $51,584.76 |