| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 07-1750 | DALA DE LIGA, INCLUYE CIMBRA Y DESCIMBRA SECCION= 20 X 30 CM, CONCRETO F'C=150 KG/CM2-3/4", REFORZADA CON 4 VARILLAS R.N. DE 3/8" ESTRIBOS DE 1/4" A/C 25 CM | M |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 1900-05 | MADERA DE PINO DE 3A. EN DUELA DE 1" X 4" | PT | 1.962000 | $12.74 | $25.00 |
| 0084-00 | VARILLA FY=4200 KG/CM2 NO. 3 ( 3/8" ) | KG | 2.339400 | $10.43 | $24.40 |
| 0080-01 | ALAMBRON LISO DE 1/4" ( NO. 2 ) | KG | 1.106900 | $12.55 | $13.89 |
| 0082-00 | ALAMBRE RECOCIDO NO. 16 | KG | 0.200000 | $14.23 | $2.85 |
| 0100-00 | CLAVO DE 2 1/2" A 3 1/2" | KG | 0.135000 | $18.93 | $2.56 |
| 0950-05 | DIESEL | LT | 0.600000 | $5.41 | $3.25 |
| Suma de Material | $71.95 | ||||
| Mano de Obra | |||||
| 02-0410 | CUADRILLA No 41 ( 1 ALBA脩IL + 1 PEON ) | JOR | 0.148100 | $756.84 | $112.09 |
| Suma de Mano de Obra | $112.09 | ||||
| Concepto | |||||
| 03-2040 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4" | M3 | 0.063000 | $912.50 | $57.49 |
| 03-7012 | ANDAMIO DE CABALLETES Y TABLONES CONSTRUIDO CON MADERA DE PINO DE 3潞 USADO PARA ALTURAS DE 1.50 A 3.00 M. | USO | 0.148100 | $22.08 | $3.27 |
| Suma de Concepto | $60.76 | ||||
| Costo Directo | $244.80 |