Clave | Descripción del Análisis de Precio Unitario | Unidad |
05-5590 | CONCRETO PREMEZCLADO RESISTENCIA NORMAL CON BOMBA F’C=350 KG/CM2 REVENIMIENTO DE 14 CM AGREGADO MAXIMO 3/4″ EN CIMENTACION | M3 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
0900-20 | CONCRETO PREMEZC.RN F’C=350 KG/CM2 AGREGADO MAXIMO 3/4″ (A) | M3 | 1.040000 | $2,029.03 | $2,110.19 |
0901-00 | SOBRE PRECIO POR REV. 14 CM AGREG. 3/4″ APTO PARABOMB.(A) | M3 | 1.040000 | $56.96 | $59.24 |
0601-05 | BOMBEO DE CONCRETO C/BOMBA EST. HASTA 5 NIVEL (15M ALTURA) | M3 | 1.040000 | $223.82 | $232.77 |
0302-05 | AGUA DE TOMA MUNICIPAL | M3 | 0.060000 | $18.39 | $1.10 |
Suma de Material | $2,403.30 | ||||
Mano de Obra | |||||
02-0450 | CUADRILLA No 45 ( 1 ALBAÑIL + 5 PEONES ) | JOR | 0.040000 | $1,881.35 | $75.25 |
Suma de Mano de Obra | $75.25 | ||||
Equipo | |||||
03-4010 | VIBRADOR DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HORA | 0.320000 | $6.55 | $2.10 |
Suma de Equipo | $2.10 | ||||
Costo Directo | $2,480.65 |