Clave | Descripción del Análisis de Precio Unitario | Unidad |
05-6120 | CONCRETO PREMEZCLADO RESISTENCIA RAPIDA VACIADO CON BOMBA F’C=350 KG/CM2 REVENIMIENTO DE 14 CM AGREGADO MAXIMO 3/4″ EN COLUMNAS Y MUROS | M3 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
0900-22 | CONCRETO PREMEZC.RR F’C=350 KG/CM2 AGREGADO MAXIMO 3/4″ (A) | M3 | 1.040000 | $2,192.78 | $2,280.49 |
0901-00 | SOBRE PRECIO POR REV. 14 CM AGREG. 3/4″ APTO PARABOMB.(A) | M3 | 1.040000 | $56.96 | $59.24 |
0601-05 | BOMBEO DE CONCRETO C/BOMBA EST. HASTA 5 NIVEL (15M ALTURA) | M3 | 1.040000 | $223.82 | $232.77 |
0302-05 | AGUA DE TOMA MUNICIPAL | M3 | 0.060000 | $18.39 | $1.10 |
Suma de Material | $2,573.60 | ||||
Mano de Obra | |||||
02-0450 | CUADRILLA No 45 ( 1 ALBAÑIL + 5 PEONES ) | JOR | 0.055500 | $1,881.35 | $104.41 |
Suma de Mano de Obra | $104.41 | ||||
Equipo | |||||
03-4010 | VIBRADOR DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HORA | 0.444400 | $6.55 | $2.91 |
Suma de Equipo | $2.91 | ||||
Costo Directo | $2,680.92 |