Grupo electrogeno Caterpillar 3304 de 90 kw de 139 hp

Clave Descripción del costo horario Unidad
4200-04-01 Grupo electrogeno Caterpillar 3304 de 90 kw de 139 hp hr
DATOS GENERALES
Vad = VALOR DE ADQUISICIÓN $388,991.21 Pnom = POTENCIA NOMINAL 138.990000 H.P.
Pn = VALOR DE LAS LLANTAS $0.00 Fo = FACTOR DE OPERACION 1.0000
Pa = VALOR DE PIEZAS ESPECIALES $0.00 TIPO DE COMBUSTIBLE Diesel
Vm = VALOR NETO $388,991.21 Cco = COEFICIENTE DE COMBUSTIBLE 0.100007
Vr = VALOR DE RESCATE $77,798.24 Pc = PRECIO DEL COMBUSTIBLE $11.07 /LITRO
i = TASA DE INTERES 16.000000 /AÑO Cc = CAPACIDAD DEL CARTER 0.00 LITROS
s = PRIMA DE SEGUROS 2.000000 /AÑO Tc = TIEMPO ENTRE CAMBIO DE ACEITE 0 HORAS
Ko = FACTOR DE MANTENIMIENTO 0.670000 HORAS Fl = FACTOR DE LUBRICANTE 0.00143895244262177
Ve = VIDA ECONÓMICA 9,900.00 HORAS Pac = PRECIO DEL ACEITE $48.28 /LITRO
Vn = VIDA ECONÓM. DE LAS LLANTAS 0.00 HORAS Gh=CANTIDAD DE COMBUSTIBLE = Cco*Fo*Pnom 13.900000 LITROS/HORA
Va = VIDA ECONOM. PIEZAS ESPECIALES 0.00 HORAS Ah=CANTIDAD DE LUBRICANTE = Fl*Fo*Pnom 0.200000 LITROS/HORA
Hea = HORAS TRABAJADAS POR AÑO 1,100.00 HORAS Ga=CONSUMO ENTRE CAMBIOS DE LUBRICANTE = Cc/Tc 0.000000 LITROS/HORA
Ht = Horas por turno 6.400000 Ht = HORAS
CONCEPTO OPERACIONES ACTIVO EN ESPERA EN RESERVA
COSTOS FIJOS
DEPRECIACIÓN (D) = (Vm-Vr)/Ve (388991.21-77798.24)/9900.00 $31.43 $25.14 $25.14
INVERSIÓN (Im) = [(Vm+Vr)/2Hea]i [(388991.21+77798.24)/(2*1100.00)]0.160000 $33.95 $33.95 $33.95
SEGURO (Sm) = [(Vm+Vr)/2Hea]s [(388991.21+77798.24)/(2*1100.00)]0.020000 $4.24 $4.24 $4.24
MANTENIMIENTO (Mn) = Ko * D 0.670000*31.43 $21.06 $21.06 $16.85
Costos fijos $90.68 $84.39 $80.18
CARGOS POR CONSUMO
COMBUSTIBLE Co = GhxPc 13.900000*11.07 $153.87 $46.16 $0.00
OTRAS FUENTES DE ENERGÍA 0*0 $0.00 $0.00 $0.00
LUBRICANTES Lb = (Ah+Ga)Pac (0.200000+0)48.28 $9.66 $2.90 $0
LLANTAS = Pn/Vn 0/0 $0.00 $0.00 $0.00
PIEZAS ESPECIALES = Pa/Va 0/0 $0.00 $0.00 $0.00
Cargos por consumo $163.53 $49.06 $0.00
CARGOS POR OPERACIÓN
CATEGORÍA CANTIDAD SALARIO REAL Ht ACTIVO EN ESPERA EN RESERVA
Operador de 1a. p/equipos menores 1 $471.88 6.400000 $73.73 $0.00 $0.00
SUMA (Sr) $471.88 6.400000 $73.73 $0 $0
Cargos por operación (Sr/Ht) $73.73 $0 $0
Costo Directo por Hora $327.94 $133.45 $80.18

Página  [tcb_pagination_current_page]  de  [tcb_pagination_total_pages]


×
Usuarios Free solo pueden consultar un número limitado de páginas (). Haz clic aquí para suscribirte y obtener acceso a los análisis.