Nueva imagen, mejor experiencia: +200,000 APUs disponibles. 10,000 con costos 2025, actualizamos los costos de 300 m谩s cada d铆a. Consultar APUS sin restricciones.

Grua Grove AT400 DE 20 TON

ClaveDescripci贸n del costo horarioUnidad
CNA-MAQ-02Grua Grove AT400 DE 20 TONhora
DATOS GENERALES
Vad = VALOR DE ADQUISICI脫N$3,795,000.00Pnom = POTENCIA NOMINAL171.000000H.P.
Pn = VALOR DE LAS LLANTAS$0.00Fo = FACTOR DE OPERACION1.0000
Pa = VALOR DE PIEZAS ESPECIALES$0.00TIPO DE COMBUSTIBLEDiesel
Vm = VALOR NETO$3,795,000.00Cco = COEFICIENTE DE COMBUSTIBLE0.1877
Vr = VALOR DE RESCATE$379,500.00Pc = PRECIO DEL COMBUSTIBLE$8.70/LITRO
i = TASA DE INTERES4.800000/A脩OCc = CAPACIDAD DEL CARTER0.00LITROS
s = PRIMA DE SEGUROS3.000000/A脩OTc = TIEMPO ENTRE CAMBIO DE ACEITE0HORAS
Ko = FACTOR DE MANTENIMIENTO0.790000HORASFl = FACTOR DE LUBRICANTE0.0043
Ve = VIDA ECON脫MICA7,800.00HORASPac = PRECIO DEL ACEITE$45.00/LITRO
Vn = VIDA ECON脫M. DE LAS LLANTAS4,000.00HORASGh=CANTIDAD DE COMBUSTIBLE = Cco*Fo*Pnom32.099949LITROS/HORA
Va = VIDA ECONOM. PIEZAS ESPECIALES1,000.00HORASAh=CANTIDAD DE LUBRICANTE = Fl*Fo*Pnom0.730000LITROS/HORA
Hea = HORAS TRABAJADAS POR A脩O1,200.00HORASGa=CONSUMO ENTRE CAMBIOS DE LUBRICANTE = Cc/Tc0.000000LITROS/HORA
Ht = Horas por turno1.000000Ht = HORAS
CONCEPTOOPERACIONESACTIVOEN ESPERAEN RESERVA
COSTOS FIJOS
DEPRECIACI脫N (D) = (Vm-Vr)/Ve(3,795,000.000000-379,500.000000)/7,800.000000$437.88$350.30$350.30
INVERSI脫N (Im) = [(Vm+Vr)/2Hea]i[(3,795,000.000000+379,500.000000)/(2*1,200.000000)]4.800000$83.49$83.49$83.49
SEGURO (Sm) = [(Vm+Vr)/2Hea]s[(3,795,000.000000+379,500.000000)/(2*1,200.000000)]3.000000$52.18$52.18$52.18
MANTENIMIENTO (Mn) = Ko * D0.790000*437.884615$345.93$345.93$276.74
Costos fijos$919.48$831.90$762.71
CARGOS POR CONSUMO
COMBUSTIBLE (Co_h)32.099949*8.70$279.27$83.78$0.00
OTRAS FUENTES DE ENERG脥A0*0$0.00$0.00$0.00
LUBRICANTES (Lb_h)0.730000*45.00$32.85$9.86$0.00
LLANTAS = Pn/Vn0.000000/4,000.000000$0.00$0.00$0.00
PIEZAS ESPECIALES = Pa/Va0.000000/1000.000000$0.00$0.00$0.00
Cargos por consumo$312.12$93.64$0.00
CARGOS POR OPERACI脫N
CATEGOR脥ACANTIDADSALARIO REALHtACTIVOEN ESPERAEN RESERVA
Cuadrilla (1 Operador de equipo mayor + 1 Ayudante)0.125000$1,436.511.000000$179.56$0.00$0.00
SUMA (Sr)$179.561.000000$179.56$0.00$0.00
Cargos por operaci贸n (Sr/Ht)$179.56$0.00$0.00
Costo Directo por Hora$1,411.16$925.54$762.71

Tu Punto de Partida: +200,000 Precios Unitarios

Olv铆date de la p谩gina en blanco. Consulta estructuras, rendimientos y componentes listos para adaptar a tu proyecto.

驴Necesitas Ayuda con tu Presupuesto?

Completa el formulario y nuestro equipo te responder谩 en menos de 24 horas.

WhatsApp

521 55 3247 4727

Email

contacto@analisisdepreciosunitarios.com

Ubicaci贸n

Ciudad de M茅xico, M茅xico