Clave | Descripción del Análisis de Precio Unitario | Unidad |
ZAPAT001 | Zapata aislada de 1.80 cms. de ancho y 30 cms. de peralte, en caseta de control para tanque elevado, armada en lecho inferior con varilla de 1/2″ @ 20 cms en ambos sentidos, en lecho superior con varilla de 3/8″ @ 25 cms. concreto f’c=250 kg/cm2, incluye: cimbra, descimbra, vibrado, curado, acarreos, | PZA |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
01VAR003 | VARILLA CORRUGADA DE 3/8″ | KG | 11.170000 | $8.60 | $96.06 |
01VAR004 | VARILLA CORRUGADA DE 1/2″ | KG | 21.000000 | $8.60 | $180.60 |
01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 1.000000 | $18.00 | $18.00 |
06CIM005 | CIMBRAPLAY DE 5/8″ | M2 | 0.430000 | $110.00 | $47.30 |
06MAD001 | MADERA DE PINO | PT | 7.000000 | $10.00 | $70.00 |
13DIE000 | DIESEL | LT | 1.300000 | $7.00 | $9.10 |
06CLA001 | CLAVOS | KG | 0.060000 | $18.00 | $1.08 |
Suma de Material | $422.14 | ||||
Mano de Obra | |||||
MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.300000 | $401.97 | $120.59 |
MOC05001 | CARPINTERO DE OBRA | JOR | 0.600000 | $401.97 | $241.18 |
MOF05001 | OFICIAL FIERRERO | JOR | 0.360000 | $401.97 | $144.71 |
MOA05003 | AYUDANTE | JOR | 0.600000 | $245.43 | $147.26 |
MOA05004 | P E O N | JOR | 1.200000 | $210.17 | $252.20 |
MI000001 | MANDO INTERMEDIO | (%)MO | 0.050000 | $905.94 | $45.30 |
Suma de Mano de Obra | $951.24 | ||||
Herramienta | |||||
HE000001 | HERRAMIENTA MENOR | (%)MO | 0.020000 | $905.94 | $18.12 |
Suma de Herramienta | $18.12 | ||||
Equipo | |||||
MAQVI001 | VIBRADOR DE GASOLINA DE 2″ Y 8 HP | M3 | 1.020000 | $23.69 | $24.16 |
Suma de Equipo | $24.16 | ||||
Auxiliar | |||||
BASIC009 | CONCRETO F’C=250 KG/CM2, T.M.A. 3/4″ | M3 | 1.020000 | $1,461.63 | $1,490.86 |
BASIC015 | CONCRETO F’C=200 KG/CM2, T.M.A. 3/8″ (SELLO) | M3 | 0.170000 | $1,467.52 | $249.48 |
BASIC000 | CURADO CON CURACRETO | M2 | 3.240000 | $4.01 | $12.99 |
Suma de Auxiliar | $1,753.33 | ||||
Costo Directo | $3,168.99 |