Materiales |
|
|
|
|
CCPIIIMA179 |
Pintura de tráfico blanca o amprilla |
lt |
0.025 |
120.63 |
3.02 |
CCPIIIMA180 |
Microesfera reflejante |
kg |
0.0525 |
20.46 |
1.07 |
|
Suma de Materiales |
|
|
|
4.09 |
|
Mano de Obra |
|
|
|
|
CCPIIIMO04 |
Cuadrilla peón + 1/10 cabo |
jor |
0.0006 |
745.5 |
0.45 |
|
Suma de Mano de Obra |
|
|
|
0.45 |
|
Herramienta |
|
|
|
|
CCPIIIHE01 |
Herramienta menor |
% |
3 |
6242.12 |
18726.36 |
|
Suma de Herramienta |
|
|
|
18726.36 |
|
Equipo |
|
|
|
|
CCPIIIEQ62 |
máquina pintarrayas, mot diesel de 45 hp mca siesa |
hr |
0.0044 |
121.76 |
0.54 |
CCPIIIEQ33 |
Camioneta pick – up ford f – 250 ranger 8 cilindros 1.5 ton 85 hp |
hr |
0.0044 |
269.18 |
1.18 |
|
Suma de Equipo |
|
|
|
1.72 |
|
Costo Directo |
|
|
|
18732.62 |