Materiales |
|
|
|
|
CCPIIMA569 |
Piedra braza |
m3 |
0.432 |
240.04 |
103.7 |
CCPIIMA34 |
Mortero cemento arena 1:5 |
lt |
43 |
0.8 |
34.4 |
CCPIIMA565 |
Concreto hecho in – situ f’c = 150 (obra urb) agreg max 38 mm |
m3 |
0.165 |
1076.35 |
177.6 |
CCPIIMA570 |
Tubo de concreto 20 cm diámetro junteado con mortero cemento – arena 1:4 incl acarreo y maniobras local |
m |
1.2 |
124.53 |
149.44 |
|
Suma de Materiales |
|
|
|
465.14 |
|
Mano de Obra |
|
|
|
|
CCPIIMO05 |
Cuadrilla albañil + peón + 1/5 cabo |
jor |
0.5 |
1855.27 |
927.64 |
|
Suma de Mano de Obra |
|
|
|
927.64 |
|
Herramienta |
|
|
|
|
CCPIIHE01 |
Herramienta menor |
% |
3 |
7285.65 |
21856.95 |
|
Suma de Herramienta |
|
|
|
21856.95 |
|
Costo Directo |
|
|
|
23249.73 |