Clave | Descripción del Análisis de Precio Unitario | Unidad |
040626 | CASTILLO DE CONCRETO AHOGADO EN MURO DE BLOCK O TABIQUE DE PERF. VERTICAL MURO DE 10 CM (EN 3 HUECO) CONC. F’C=200 KG/CM2-3/4″ REF. CON 3 VARILLA R.N. DE 3/8″ ESTRIBOS DE 1/4″ A/C 2 HILADAS | M |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
0084-00 | VARILLA FY=4200 KG/CM2 NO. 3 ( 3/8″ ) | KG | 1.752000 | $4.03 | $7.06 |
0080-01 | ALAMBRON LISO DE 1/4″ ( NO. 2 ) | KG | 0.312000 | $4.80 | $1.50 |
Suma de Material | $8.56 | ||||
Mano de Obra | |||||
02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | JOR | 0.055000 | $564.43 | $31.04 |
Suma de Mano de Obra | $31.04 | ||||
Auxiliar | |||||
03-2060 | CONCRETO HECHO EN OBRA F’C=200 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4″ | M3 | 0.015600 | $725.61 | $11.32 |
03-7012 | ANDAMIO DE CABALLETES Y TABLONES CONSTRUIDO CON MADERA DE PINO DE 3¬ USADO PARA ALTURAS DE 1.50 A 3.00 M. | USO | 0.027700 | $16.06 | $0.44 |
Suma de Auxiliar | $11.76 | ||||
Costo Directo | $51.36 |