| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 041426 | PISO DE CONCRETO ARMADO DE 8 CM DE ESPESOR CONCRETO HECHO EN OBRA F'C=150 KG/CM2, AGREGADO MAXIMO 1 1/2" REFUERZO = MALLA 66-1010 ACABADO PULIDO | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 0107-00 | MALLA ELECTROSOLDADA TECNOMALLA 6 X 6-10/10 | M2 | 1.020000 | $5.46 | $5.57 |
| 0300-03 | CEMENTO NORMAL GRIS TIPO I EN SACO | TON | 0.001000 | $1,298.69 | $1.30 |
| Suma de Material | $6.87 | ||||
| Mano de Obra | |||||
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | JOR | 0.117600 | $564.43 | $66.38 |
| Suma de Mano de Obra | $66.38 | ||||
| Auxiliar | |||||
| 03-2170 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 1 1/2" | M3 | 0.083200 | $622.86 | $51.82 |
| Suma de Auxiliar | $51.82 | ||||
| Costo Directo | $125.07 |