| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 040631 | CASTILLO DE CONCRETO AHOGADO EN MURO DE BLOCK O TABIQUE DE PERF. VERTICAL MURO DE 12 CM (EN 2 HUECOS) CONC. F'C=200 KG/CM2-3/4" REF. CON 2 VARILLA A.R. DE 5/16" ESTRIBOS DE 1/4" A/C 2 HILADAS | M |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 0091-01 | VARILLA ALTA RESISTENCIA FY=6000 NO 2.5 (5/16") | KG | 0.820000 | $8.32 | $6.82 |
| 0080-01 | ALAMBRON LISO DE 1/4" ( NO. 2 ) | KG | 0.156000 | $4.80 | $0.75 |
| Suma de Material | $7.57 | ||||
| Mano de Obra | |||||
| 02-0410 | CUADRILLA No 41 ( 1 ALBAÑIL + 1 PEON ) | JOR | 0.050000 | $564.43 | $28.22 |
| Suma de Mano de Obra | $28.22 | ||||
| Auxiliar | |||||
| 03-2040 | CONCRETO HECHO EN OBRA F'C=150 KG/CM2, RESISTENCIA NORMAL, AGREGADO MAXIMO 3/4" | M3 | 0.014000 | $672.18 | $9.41 |
| 03-7012 | ANDAMIO DE CABALLETES Y TABLONES CONSTRUIDO CON MADERA DE PINO DE 3¬ USADO PARA ALTURAS DE 1.50 A 3.00 M. | USO | 0.025000 | $16.06 | $0.40 |
| Suma de Auxiliar | $9.81 | ||||
| Costo Directo | $45.60 |