| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 2240 00 | Suministro e instalaci贸n de caja de operaci贸n de v谩lvulas de 100 x 90 cms. (Tipo ii) | pza |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| AGUA-01 | AGUA (ADQUIRIDA EN PIPA) | m3 | 0.120000 | $75.79 | $9.09 |
| MADERA-02 | MADERA DE PINO DE TERCERA | PT | 3.000000 | $8.08 | $24.24 |
| CLAVO-01 | CLAVO DE 11/2", 2", 21/2" | kg | 0.100000 | $16.17 | $1.62 |
| MADERA-05 | TABLA MADERA DE PINO DE 6"x1"x8' (TRES USOS) | PZA | 4.000000 | $16.33 | $65.32 |
| ARMEX-12X12 | ARMEX 12x12-4 | ML | 9.000000 | $26.78 | $241.02 |
| MATINER-01 | MATERIAL INERTE P/RELLENO. | M3 | 0.500000 | $30.32 | $15.16 |
| B1EXX025 | tabique rojo recocido 7x14x28 cm. | MIL | 0.227000 | $1,601.64 | $363.57 |
| APBXX020 | GRAVA de 3/4" | M3 | 0.022000 | $237.47 | $5.22 |
| Suma de Material | $725.24 | ||||
| Auxiliar | |||||
| MORT-005 | MORTERO CEMENTO-ARENA PROPOR. 1:4. | M3 | 0.160000 | $896.44 | $143.43 |
| CONCR-200 | CONCRETO HECHO EN OBRA R.N. DE F'c=200 KG/CM2 | M3 | 0.466000 | $1,020.51 | $475.56 |
| CUAD-002 | CUADRILLA No.2 1 OF. ALBA脩IL + 1 AYTE. | jor | 1.500000 | $657.83 | $986.75 |
| Suma de Auxiliar | $1,605.74 | ||||
| Costo Directo | $2,330.98 |