Clave | Descripción del auxiliar o básico | Unidad |
ZAPAT044 | ZAPATA CORRIDA DE 2.40 MTS DE ANCHO Y 35 CMS DE PERALTE, Y DADO TRAPEZOIDAL DE 40 CMS DE BASE, 20 CMS DE CORONA Y 1.25 MTS DE PERALTE, COLADOS MONOLITICAMENTE, PARA MURO DE CONTENCION, DE CONCRETO F’C=200 KG/CM2 ARMADO CON VARILLAS DE 3/8″, 1/2″, 5/8″ Y 3/4″ A DIFERENTES SEPARACIONES EN SENTIDO TRANSVERSAL, 19 VARILLAS DE 3/8″ Y 6 VARILLAS DE 1/2″ EN SENTIDO LONGITUDINAL, SE INCLUYE: CIMBRA, DESCIMBRA, VIBRADO, CURADO CON CURACRETO, ACARREOS, MATERIAL, MANO DE OBRA Y HERRAMIENTA. | ML |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
01VAR006 | VARILLA CORRUGADA DE 3/4″ | KG | 35.5968 | 8.6 | 306.13 |
01VAR005 | VARILLA CORRUGADA DE 5/8″ | KG | 22.5828 | 8.6 | 194.21 |
01VAR004 | VARILLA CORRUGADA DE 1/2″ | KG | 13.608 | 8.6 | 117.03 |
01VAR003 | VARILLA CORRUGADA DE 3/8″ | KG | 13.6728 | 8.6 | 117.59 |
01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 2.56381 | 18 | 46.15 |
06MAD001 | MADERA DE PINO | PT | 2.41595 | 10 | 24.16 |
06CLA001 | CLAVOS | KG | 0.184 | 18 | 3.31 |
13DIE000 | DIESEL | LT | 0.414 | 7 | 2.9 |
Suma de Material | 811.48 | ||||
Mano de Obra | |||||
MOF05001 | OFICIAL FIERRERO | JOR | 0.8546 | 401.97 | 343.52 |
MOA05003 | AYUDANTE | JOR | 0.8543 | 245.43 | 209.67 |
MOC05001 | CARPINTERO DE OBRA | JOR | 0.5752 | 401.97 | 231.21 |
MOA05003 | AYUDANTE | JOR | 0.5752 | 245.43 | 141.17 |
MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.25516 | 401.97 | 102.57 |
MOA05004 | P E O N | JOR | 1.27578 | 210.17 | 268.13 |
MI000001 | MANDO INTERMEDIO | (%)MO | 0.05 | 1296.27 | 64.81 |
Suma de Mano de Obra | 1361.08 | ||||
Herramienta | |||||
HE000001 | HERRAMIENTA MENOR | (%)MO | 0.02 | 1296.27 | 25.93 |
Suma de Herramienta | 25.93 | ||||
Equipo | |||||
MAQVI001 | VIBRADOR DE GASOLINA DE 2″ Y 8 HP | M3 | 1.215 | 23.69 | 28.78 |
Suma de Equipo | 28.78 | ||||
Auxiliar | |||||
BASIC007 | CONCRETO F’C=200 KG/CM2, T.M.A. 3/4″ | M3 | 1.27575 | 1272.72 | 1623.67 |
BASIC000 | CURADO CON CURACRETO | M2 | 4.7 | 4.01 | 18.85 |
Suma de Auxiliar | 1642.52 | ||||
Costo Directo | 3869.79 |