Clave | Descripción del auxiliar o básico | Unidad |
BASIC005 | CONCRETO F’C=150 KG/CM2, T.M.A. 3/4″ | M3 |
Clave | Descripción | Unidad | Cantidad | Costo | Importe |
---|---|---|---|---|---|
Material | |||||
02CEM000 | CEMENTO GRIS | KG | 371.7 | 2.4 | 892.08 |
03ARE000 | ARENA | M3 | 0.528 | 130.01 | 68.65 |
03GRA000 | GRAVA DE 3/4″ | M3 | 0.737 | 130.01 | 95.82 |
28AGUA00 | AGUA CON PIPA | M3 | 0.2645 | 80 | 21.16 |
Suma de Material | 1077.71 | ||||
Auxiliar | |||||
BASIF000 | FABRICACION DE CONCRETO | M3 | 1 | 107.44 | 107.44 |
Suma de Auxiliar | 107.44 | ||||
Costo Directo | 1185.15 |