| Clave | Descripción del auxiliar o básico | Unidad |
| ZAPAT037 | ZAPATA CORRIDA DE 1.70 MTS DE ANCHO Y 25 CMS DE PERALTE, Y DADO TRAPEZOIDAL DE 25 CMS DE BASE, 20 CMS DE CORONA Y 75 CMS DE PERALTE, COLADOS MONOLITICAMENTE, PARA MURO DE CONTENCION, DE CONCRETO F'C=200 KG/CM2 ARMADO CON VARILLAS DE 3/8", 1/2" Y 5/8" A DIFERENTES SEPARACIONES EN SENTIDO TRANSVERSAL Y 18 VARILLAS DE 3/8" EN SENTIDO LONGITUDINAL, SE INCLUYE: CIMBRA, DESCIMBRA, VIBRADO, CURADO CON CURACRETO, ACARREOS, MATERIAL, MANO DE OBRA Y HERRAMIENTA. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 01VAR005 | VARILLA CORRUGADA DE 5/8" | KG | 14.24736 | 8.6 | 122.53 |
| 01VAR004 | VARILLA CORRUGADA DE 1/2" | KG | 13.92826 | 8.6 | 119.78 |
| 01VAR003 | VARILLA CORRUGADA DE 3/8" | KG | 12.5053 | 8.6 | 107.55 |
| 01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 1.22043 | 18 | 21.97 |
| 06MAD001 | MADERA DE PINO | PT | 1.575 | 10 | 15.75 |
| 06CLA001 | CLAVOS | KG | 0.12 | 18 | 2.16 |
| 13DIE000 | DIESEL | LT | 0.27 | 7 | 1.89 |
| Suma de Material | 391.63 | ||||
| Mano de Obra | |||||
| MOF05001 | OFICIAL FIERRERO | JOR | 0.40681 | 401.97 | 163.53 |
| MOA05003 | AYUDANTE | JOR | 0.40681 | 245.43 | 99.84 |
| MOC05001 | CARPINTERO DE OBRA | JOR | 0.375 | 401.97 | 150.74 |
| MOA05003 | AYUDANTE | JOR | 0.375 | 245.43 | 92.04 |
| MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.12469 | 401.97 | 50.12 |
| MOA05004 | P E O N | JOR | 0.62344 | 210.17 | 131.03 |
| MI000001 | MANDO INTERMEDIO | (%)MO | 0.05 | 687.3 | 34.37 |
| Suma de Mano de Obra | 721.67 | ||||
| Herramienta | |||||
| HE000001 | HERRAMIENTA MENOR | (%)MO | 0.02 | 687.3 | 13.75 |
| Suma de Herramienta | 13.75 | ||||
| Equipo | |||||
| MAQVI001 | VIBRADOR DE GASOLINA DE 2" Y 8 HP | M3 | 0.59375 | 23.69 | 14.07 |
| Suma de Equipo | 14.07 | ||||
| Auxiliar | |||||
| BASIC007 | CONCRETO F'C=200 KG/CM2, T.M.A. 3/4" | M3 | 0.62344 | 1272.72 | 793.46 |
| BASIC000 | CURADO CON CURACRETO | M2 | 3.15 | 4.01 | 12.63 |
| Suma de Auxiliar | 806.09 | ||||
| Costo Directo | 1947.21 |