| Clave | Descripción del auxiliar o básico | Unidad |
| DALA0173 | DALA INTERMEDIA DE 20 X 20 CMS DE CONCRETO F'C=200 KG/CM2 ARMADO CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE ALAMBRON DE 1/4" A CADA 20 CMS, INCLUYE: ARMADO, CIMBRADO, DESCIMBRADO, MATERIALES, FABRICACION DE CONCRETO, COLADO, MANO DE OBRA Y HERRAMIENTA. | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| 01VAR003 | VARILLA CORRUGADA DE 3/8" | KG | 2.40624 | 8.6 | 20.69 |
| 01ALA005 | ALAMBRON DE 1/4" | KG | 1.125 | 19 | 21.38 |
| 01ALA001 | ALAMBRE RECOCIDO No. 16 | KG | 0.10581 | 18 | 1.9 |
| 06MAD001 | MADERA DE PINO | PT | 1.5 | 10 | 15 |
| 06CLA001 | CLAVOS | KG | 0.16 | 18 | 2.88 |
| 13DIE000 | DIESEL | LT | 0.24 | 7 | 1.68 |
| Suma de Material | 63.53 | ||||
| Mano de Obra | |||||
| MOF05001 | OFICIAL FIERRERO | JOR | 0.03527 | 401.97 | 14.18 |
| MOA05003 | AYUDANTE | JOR | 0.03527 | 245.43 | 8.66 |
| MOC05001 | CARPINTERO DE OBRA | JOR | 0.06 | 401.97 | 24.12 |
| MOA05003 | AYUDANTE | JOR | 0.06 | 245.43 | 14.73 |
| MOA05001 | OFICIAL ALBAÑIL 1RA. | JOR | 0.0336 | 401.97 | 13.51 |
| MOA05004 | P E O N | JOR | 0.1344 | 210.17 | 28.25 |
| MI000001 | MANDO INTERMEDIO | (%)MO | 0.05 | 103.45 | 5.17 |
| Suma de Mano de Obra | 108.62 | ||||
| Herramienta | |||||
| HE000001 | HERRAMIENTA MENOR | (%)MO | 0.02 | 103.45 | 2.07 |
| Suma de Herramienta | 2.07 | ||||
| Equipo | |||||
| 90AND001 | ANDAMIOS METÁLICOS UN MODULO | DIA | 0.12396 | 10.21 | 1.27 |
| Suma de Equipo | 1.27 | ||||
| Auxiliar | |||||
| BASIC007 | CONCRETO F'C=200 KG/CM2, T.M.A. 3/4" | M3 | 0.042 | 1272.72 | 53.45 |
| Suma de Auxiliar | 53.45 | ||||
| Costo Directo | 228.94 |