| Clave | Descripción del auxiliar o básico | Unidad |
| 4122-38 | COLUMNA CIRCULAR DE CONCRETO F'c=200 KG/CM2, SECCION 20 x 20 CM, ARMADO CON 6 Vs # 6 Y EST #4 @ 20 CMS INCLUYE CIMBRA Y DESCIMBRA | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
|---|---|---|---|---|---|
| Material | |||||
| MADERA P/CIMBRA 1 | MADERA PARA CIMBRA | PT | 7.8 | 16.15 | 125.97 |
| CLAVO 1/2" 1 | CLAVO 1/2" | KG | 0.16 | 34 | 5.44 |
| ALAMBRE REC #18 1 | ALAMBRE RECOCIDO # 18 | KG | 0.1 | 19 | 1.9 |
| DIESEL 1 | DIESEL | LTO | 0.4 | 11.28 | 4.51 |
| CHAF P/MAD 1 | CHAFLAN PARA MADERA DE 1" | M | 4 | 2.5 | 10 |
| Suma de Material | 147.82 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.00667 | 307.31 | 2.05 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.06667 | 251.32 | 16.76 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.06667 | 197.97 | 13.2 |
| OBRERO GENERAL 1 | OBRERO GENERAL | JOR | 0.06667 | 185.16 | 12.34 |
| Suma de Mano de Obra | 44.35 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.03 | 44.35 | 1.33 |
| Suma de Herramienta | 1.33 | ||||
| Auxiliar | |||||
| ACERO REF #6 1 | ACERO DE REFUERZO # 6 | KG | 13.5 | 17.93 | 242.06 |
| ACERO REF #4 1 | ACERO DE REFUERZO # 4 | KG. | 9.97 | 18.3 | 182.45 |
| CONCRETO F-C=200 1 | CONCRETO F'c=200 KG/CM2 | M3 | 0.16 | 1322.37 | 211.58 |
| VAC DE CONC 1 | VACIADO DE CONCRETO | M3 | 0.16 | 230.7 | 36.91 |
| Suma de Auxiliar | 673 | ||||
| Costo Directo | 866.5 |